Squeezing every last drop: life extension of the LHC and PS access safety systems

The LHC Access Safety System (LASS) was commissioned in 2008 for the initial launch of the LHC, while the current PS Access Safety System (PASS) entered in operation in 2015 after a full multi-year revision. By the end of the upcoming LHC Long Shutdown 3 in 2030, LASS will have accumulated over 20 years of service and PASS 15 years. Both systems are based on Siemens series 400 safety PLCs, a product line that is being progressively phased out by the vendor. After evaluating several consolidation strategies to ensure the smoothest possible continuity of operation of both LHC and PS, we have opted for a life extension of both current access safety systems. This strategy retains the existing systems but introduces a number of architectural enhancements to mitigate current limitations that could impact accelerator availability. The objective is to secure reliable long-term operation of both safety systems, while also improving operational autonomy, maintenance capabilities, and resilience to vendor product life cycles. This paper outlines the rationale behind the selected approach, the external factors influencing our decision, and the key steps planned to implement this consolidation effectively.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tubr001
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Squeezing every last drop: life extension of the LHC and PS access safety systems

JACOW
Superconducting Materials and Applications
article

Squeezing every last drop: life extension of the LHC and PS access safety systems

article en

Abstract

The LHC Access Safety System (LASS) was commissioned in 2008 for the initial launch of the LHC, while the current PS Access Safety System (PASS) entered in operation in 2015 after a full multi-year revision. By the end of the upcoming LHC Long Shutdown 3 in 2030, LASS will have accumulated over 20 years of service and PASS 15 years. Both systems are based on Siemens series 400 safety PLCs, a product line that is being progressively phased out by the vendor. After evaluating several consolidation strategies to ensure the smoothest possible continuity of operation of both LHC and PS, we have opted for a life extension of both current access safety systems. This strategy retains the existing systems but introduces a number of architectural enhancements to mitigate current limitations that could impact accelerator availability. The objective is to secure reliable long-term operation of both safety systems, while also improving operational autonomy, maintenance capabilities, and resilience to vendor product life cycles. This paper outlines the rationale behind the selected approach, the external factors influencing our decision, and the key steps planned to implement this consolidation effectively.

JACOW
Responsible consumption and production
Openalex Percentile: Top 48%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Squeezing every last drop: life extension of the LHC and PS access safety systems · JACOW (2025) | TGRS Research Map | TGRS