CERN SCADA systems 2024 large upgrade campaign retrospective

This paper presents a recent upgrade campaign of supervisory control systems within CERN's Accelerator and Technologies Sector. The effort covered over 240 WinCC OA SCADA applications across more than 120 servers, spanning core accelerator systems such as Power Converters, the Quench Protection System, and the Power Interlock Controller, along with essential technical infrastructure including Cryogenics, Vacuum, and Gas Control. These systems are crucial for machine protection, performance, and the reliable operation of the accelerator complex. Building on experience from previous upgrade efforts, this campaign introduced important advances in automation and process optimization. For the first time, a fully unattended upgrade workflow was achieved through the use of Ansible. In addition the campaign involved a major operating system migration and the upgrade of several supporting satellite systems. This paper details the improvements made in this iteration, discusses the challenges and compares the current campaign with earlier ones. The analysis highlights the evolution of automation strategies and reflects on both successes and difficulties. The work offers valuable insights for future upgrade initiatives and demonstrates how automation tools can significantly enhance the maturity and reliability of large-scale software maintenance in complex operational environments.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tupd021
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

CERN SCADA systems 2024 large upgrade campaign retrospective

JACOW
Particle Accelerators and Free-Electron Lasers
article

CERN SCADA systems 2024 large upgrade campaign retrospective

article en

Abstract

This paper presents a recent upgrade campaign of supervisory control systems within CERN's Accelerator and Technologies Sector. The effort covered over 240 WinCC OA SCADA applications across more than 120 servers, spanning core accelerator systems such as Power Converters, the Quench Protection System, and the Power Interlock Controller, along with essential technical infrastructure including Cryogenics, Vacuum, and Gas Control. These systems are crucial for machine protection, performance, and the reliable operation of the accelerator complex. Building on experience from previous upgrade efforts, this campaign introduced important advances in automation and process optimization. For the first time, a fully unattended upgrade workflow was achieved through the use of Ansible. In addition the campaign involved a major operating system migration and the upgrade of several supporting satellite systems. This paper details the improvements made in this iteration, discusses the challenges and compares the current campaign with earlier ones. The analysis highlights the evolution of automation strategies and reflects on both successes and difficulties. The work offers valuable insights for future upgrade initiatives and demonstrates how automation tools can significantly enhance the maturity and reliability of large-scale software maintenance in complex operational environments.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 47%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

CERN SCADA systems 2024 large upgrade campaign retrospective · JACOW (2025) | TGRS Research Map | TGRS