Third and fourth phase update of control network in J-PARC MR

The control network in J-PARC is a dedicated network that enables to control distributed power supplies and measuring instruments used for the accelerator. It is independent from the office network, but some communications are permitted through a firewall. The control network consists of a lot of switches: (a) core switches in the central control building, (b) aggregation switches in each accelerator facility, and (c) edge switches. The control network started in 2005, and this year, 2025, marks its 20th anniversary. At J-PARC, the network equipment has been updated about every 7 years. The third phase of update began around 2018, and in Main Ring it was completed in 2023. This report describes how the control network changed from the original design up to the third phase of update. It also discusses the planned fourth phase, including big changes on operation and maintenance support.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-thpd005
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Third and fourth phase update of control network in J-PARC MR

JACOW
Particle Accelerators and Free-Electron Lasers
article

Third and fourth phase update of control network in J-PARC MR

article en

Abstract

The control network in J-PARC is a dedicated network that enables to control distributed power supplies and measuring instruments used for the accelerator. It is independent from the office network, but some communications are permitted through a firewall. The control network consists of a lot of switches: (a) core switches in the central control building, (b) aggregation switches in each accelerator facility, and (c) edge switches. The control network started in 2005, and this year, 2025, marks its 20th anniversary. At J-PARC, the network equipment has been updated about every 7 years. The third phase of update began around 2018, and in Main Ring it was completed in 2023. This report describes how the control network changed from the original design up to the third phase of update. It also discusses the planned fourth phase, including big changes on operation and maintenance support.

JACOW
Affordable and clean energy
Openalex Percentile: Top 47%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.