First phase of control system for compact Muon Linac at J-PARC

A Muon Linear accelerator (Muon Linac) for the muon g-2/EDM experiment is currently under construction at Japan Proton Accelerator Research Complex (J-PARC). The objective of this project is to accelerate thermal muons (25 meV at 300 K) to 212 MeV, marking the world’s first implementation of muon acceleration. Development of the control system for the Muon Linac began in 2024. Core functionalities of the Ultra-Slow Muon section have been tested during beam time in May 2025. The system adopts the standard EPICS framework and features a compact architecture consisting of (a) a QNAP NAS for disk storage, (b) two operator terminals, and (c) two commercial micro servers serving as the EPICS IOC and the archiver server, respectively. This paper reports on the status of the control system development for the Ultra-Slow Muon section, as part of the first phase of the Muon Linac project. Toward the full commissioning of the entire Muon Linac in 2028, the prospects for extending the present control system to the main Linac components are discussed.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-wemg003
Primary Topic
Muon and positron interactions and applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

First phase of control system for compact Muon Linac at J-PARC

JACOW
Muon and positron interactions and applications
article

First phase of control system for compact Muon Linac at J-PARC

article en

Abstract

A Muon Linear accelerator (Muon Linac) for the muon g-2/EDM experiment is currently under construction at Japan Proton Accelerator Research Complex (J-PARC). The objective of this project is to accelerate thermal muons (25 meV at 300 K) to 212 MeV, marking the world’s first implementation of muon acceleration. Development of the control system for the Muon Linac began in 2024. Core functionalities of the Ultra-Slow Muon section have been tested during beam time in May 2025. The system adopts the standard EPICS framework and features a compact architecture consisting of (a) a QNAP NAS for disk storage, (b) two operator terminals, and (c) two commercial micro servers serving as the EPICS IOC and the archiver server, respectively. This paper reports on the status of the control system development for the Ultra-Slow Muon section, as part of the first phase of the Muon Linac project. Toward the full commissioning of the entire Muon Linac in 2028, the prospects for extending the present control system to the main Linac components are discussed.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 46%
Muon and positron interactions and applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.