A new PLC based control system to orchestrate the PS main power converters

The Power for the PS (POPS) system supplies the Proton Synchrotron (PS) magnets by exchanging energy between capacitor banks and magnet loads, minimizing direct power draw from the electrical network. The POPS+ upgrade improves availability through redundancy by integrating additional power converters, introducing a new PLC-based control system to manage increased complexity and to retrofit legacy turnkey controls infrastructure. This distributed architecture features a central PLC orchestrating all power converters and their FGC4-based controllers. The PLC enables the custom integration of the FGC4 platform, originally designed for generic converters, into POPS+. A key challenge is the implementation of a real-time Ethernet communication protocol (FGC4PN) on a Multi-Functional Platform (MFP) attached to the PLC. The PLC also manages the state machine, including startup, charging and stopping sequences, as well as interlocks and safe start conditions, leveraging CERN’s UNICOS framework for standardized control and SCADA supervision. This paper presents the design and implementation of the control system, detailing the distributed architecture and the communication strategies. It also highlights the use of the Hardware-in-the-Loop (HIL) simulation platform for the system integration, development and virtual commissioning.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tupd012
Primary Topic
Real-time simulation and control systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A new PLC based control system to orchestrate the PS main power converters

JACOW
Real-time simulation and control systems
article

A new PLC based control system to orchestrate the PS main power converters

article en

Abstract

The Power for the PS (POPS) system supplies the Proton Synchrotron (PS) magnets by exchanging energy between capacitor banks and magnet loads, minimizing direct power draw from the electrical network. The POPS+ upgrade improves availability through redundancy by integrating additional power converters, introducing a new PLC-based control system to manage increased complexity and to retrofit legacy turnkey controls infrastructure. This distributed architecture features a central PLC orchestrating all power converters and their FGC4-based controllers. The PLC enables the custom integration of the FGC4 platform, originally designed for generic converters, into POPS+. A key challenge is the implementation of a real-time Ethernet communication protocol (FGC4PN) on a Multi-Functional Platform (MFP) attached to the PLC. The PLC also manages the state machine, including startup, charging and stopping sequences, as well as interlocks and safe start conditions, leveraging CERN’s UNICOS framework for standardized control and SCADA supervision. This paper presents the design and implementation of the control system, detailing the distributed architecture and the communication strategies. It also highlights the use of the Hardware-in-the-Loop (HIL) simulation platform for the system integration, development and virtual commissioning.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 40%
Real-time simulation and control systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.