From terabytes to petabyte: scaling of the archiving system for FAIR

With the recent rise of AI and various machine learning models, the importance of storing and managing data generated by control systems is greater than ever before. In 2016, GSI began developing an archiving system to collect, store, and retrieve data from the diverse accelerator devices managed by the GSI control infrastructure. The system was successfully deployed in production in 2021. To evaluate its capabilities and suitability for operational needs, the system was initially launched with a limited storage capacity of 50 TB and reduced computing power. With a current data volume of over 100 GB per day, the archiving system quickly exceeded its initial limits. However, the experience gained in day-to-day operations thus far has allowed us to better understand our use-cases and identify areas for further improvement. In preparation for the anticipated start of FAIR operations in 2027, the system will require significant scaling to meet future demands. Therefore, this is an opportune moment to review and refine the system’s architecture based on the experience gained so far. This paper outlines the challenges encountered with the current implementation and presents the solutions that will be incorporated into the system for FAIR operations.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tupd109
Primary Topic
Research Data Management Practices
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From terabytes to petabyte: scaling of the archiving system for FAIR

JACOW
Research Data Management Practices
article

From terabytes to petabyte: scaling of the archiving system for FAIR

article en

Abstract

With the recent rise of AI and various machine learning models, the importance of storing and managing data generated by control systems is greater than ever before. In 2016, GSI began developing an archiving system to collect, store, and retrieve data from the diverse accelerator devices managed by the GSI control infrastructure. The system was successfully deployed in production in 2021. To evaluate its capabilities and suitability for operational needs, the system was initially launched with a limited storage capacity of 50 TB and reduced computing power. With a current data volume of over 100 GB per day, the archiving system quickly exceeded its initial limits. However, the experience gained in day-to-day operations thus far has allowed us to better understand our use-cases and identify areas for further improvement. In preparation for the anticipated start of FAIR operations in 2027, the system will require significant scaling to meet future demands. Therefore, this is an opportune moment to review and refine the system’s architecture based on the experience gained so far. This paper outlines the challenges encountered with the current implementation and presents the solutions that will be incorporated into the system for FAIR operations.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 29%
Research Data Management Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.