Commissioning and operation of vacuum control system for SPES project

The SPES (Selective Production of Exotic Species) project aims to create a facility based on particle accelerators to produce radioactive ion beams. The second phase of the project foreseen the transport of the non-reaccelerated radioactive ion beam from the TIS (Target Ion Source) to the low energy experimental hall. This part of SPES beam lines involves the major requirements in terms of complexity for the vacuum control system, as interface with GRS (Gas Recovery System), GSS (Global Safety System) and MPS (Machine Protection System), management of centralize pumping system for the exhaust, and different configurations of each section. The VCS (Vacuum Control System) of the TIS and of the following beam line sections are based on modular control units which are highly configurable to be used in different installation and with different equipment. Each unit is constituted by a SIEMENS S7-1500 PLC and 10” touch panel for the local/remote configuration and operation by expert operator, while high level control system is done in EPICS (Experimental Physics and Industrial Control System) and CSS (Control System Studio). This paper describes the commissioning phase of the VCS for the SPES facility, and the operation of the about 20 systems running at LNL (Laboratori Nazionali di Legnaro)*.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-wepd007
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Commissioning and operation of vacuum control system for SPES project

JACOW
Particle accelerators and beam dynamics
article

Commissioning and operation of vacuum control system for SPES project

article en

Abstract

The SPES (Selective Production of Exotic Species) project aims to create a facility based on particle accelerators to produce radioactive ion beams. The second phase of the project foreseen the transport of the non-reaccelerated radioactive ion beam from the TIS (Target Ion Source) to the low energy experimental hall. This part of SPES beam lines involves the major requirements in terms of complexity for the vacuum control system, as interface with GRS (Gas Recovery System), GSS (Global Safety System) and MPS (Machine Protection System), management of centralize pumping system for the exhaust, and different configurations of each section. The VCS (Vacuum Control System) of the TIS and of the following beam line sections are based on modular control units which are highly configurable to be used in different installation and with different equipment. Each unit is constituted by a SIEMENS S7-1500 PLC and 10” touch panel for the local/remote configuration and operation by expert operator, while high level control system is done in EPICS (Experimental Physics and Industrial Control System) and CSS (Control System Studio). This paper describes the commissioning phase of the VCS for the SPES facility, and the operation of the about 20 systems running at LNL (Laboratori Nazionali di Legnaro)*.

JACOW
Openalex Percentile: Top 29%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.