Supporting injector operation with the FAIR settings management system

The FAIR Settings Management System is in productive use at the GSI accelerator facility. The core of the system is developed in collaboration with CERN and is based on CERN’s Software Architecture (LSA) framework. It is currently used at GSI for operating the synchrotrons, storage rings, and transfer lines. As part of the Injector Controls Upgrade project, which aims to integrate the Unilac linear accelerator into the new control system, concepts for scheduling parallel particle beams are being further realized. In preparation for the integration of the FAIR facility, existing concepts are being reviewed, refined and implemented. A key milestone for the upcoming implementation steps is the operation of Unilac with the new control system during the beam time 2026, with preparatory beam tests starting in summer 2025. This paper describes the current implementation status.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tupd023
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Supporting injector operation with the FAIR settings management system

JACOW
Particle Accelerators and Free-Electron Lasers
article

Supporting injector operation with the FAIR settings management system

article en

Abstract

The FAIR Settings Management System is in productive use at the GSI accelerator facility. The core of the system is developed in collaboration with CERN and is based on CERN’s Software Architecture (LSA) framework. It is currently used at GSI for operating the synchrotrons, storage rings, and transfer lines. As part of the Injector Controls Upgrade project, which aims to integrate the Unilac linear accelerator into the new control system, concepts for scheduling parallel particle beams are being further realized. In preparation for the integration of the FAIR facility, existing concepts are being reviewed, refined and implemented. A key milestone for the upcoming implementation steps is the operation of Unilac with the new control system during the beam time 2026, with preparatory beam tests starting in summer 2025. This paper describes the current implementation status.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 47%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.