Control system considerations for LANSCE modernization and integration of the LAMP front-end

The Los Alamos Neutron Science Center (LANSCE) has embarked on a major modernization effort through the LANSCE Modernization Project (LAMP), which has recently received approval for mission need. LAMP proposes a new 100 MeV front end to replace aging components, including the proton sources, Cockcroft-Walton generators, and 100MeV drift tube linac. This new design will integrate with the existing cavity-coupled linac to reach the facility’s full design energy of 800 MeV, with full deployment anticipated by 2030. The modernization project introduces significant control system challenges, particularly in integrating new high-performance subsystems while maintaining full operability of the legacy infrastructure, which will remain responsible for approximately 85% of the accelerator complex. This paper discusses control system strategies for timing synchronization, high-speed data acquisition, and software integration. Key topics include compatibility between legacy and modern control protocols, deployment of real-time data systems, and software development to ensure operational continuity. The LANSCE control system must provide seamless support for both existing and modernized hardware, enabling efficient operation and long-term sustainability.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tucr004
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Control system considerations for LANSCE modernization and integration of the LAMP front-end

JACOW
Particle accelerators and beam dynamics
article

Control system considerations for LANSCE modernization and integration of the LAMP front-end

article en

Abstract

The Los Alamos Neutron Science Center (LANSCE) has embarked on a major modernization effort through the LANSCE Modernization Project (LAMP), which has recently received approval for mission need. LAMP proposes a new 100 MeV front end to replace aging components, including the proton sources, Cockcroft-Walton generators, and 100MeV drift tube linac. This new design will integrate with the existing cavity-coupled linac to reach the facility’s full design energy of 800 MeV, with full deployment anticipated by 2030. The modernization project introduces significant control system challenges, particularly in integrating new high-performance subsystems while maintaining full operability of the legacy infrastructure, which will remain responsible for approximately 85% of the accelerator complex. This paper discusses control system strategies for timing synchronization, high-speed data acquisition, and software integration. Key topics include compatibility between legacy and modern control protocols, deployment of real-time data systems, and software development to ensure operational continuity. The LANSCE control system must provide seamless support for both existing and modernized hardware, enabling efficient operation and long-term sustainability.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 29%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.