Extension of the SPIRAL2 PLC-based control system for the integration of DESIR and NEWGAIN

The SPIRAL2 heavy ion accelerator is currently undergoing several extension projects under development. In Phase 1+, the DESIR experimental hall will receive very low energy radioactive ion beams from S3 or SPIRAL1. In Phase 1++, a new cryogenic ion source and a new injector will be implemented to broaden the range of heavy ions currently accelerated. This contribution presents the integration of these new facilities into the SPIRAL2 PLC-based control system. The integration builds on recent technological upgrades while maintaining system consistency and ensuring compliance with the specific constraints related to radiation protection and operational safety. Some existing PLCs have been extended, and new ones have been added to automate processes related to beam operation (machine protection system, equipment insertion, vacuum, RF, cryogenics), building infrastructure (nuclear ventilation, refrigeration, alarm management), and nuclear safety (access control units, radiation monitoring). This integrated approach ensures a coherent, maintainable control system that supports safe and efficient operations for the DESIR and Newgain projects.

Publication Details

Journal
SPIRE - Sciences Po Institutional REpository
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-wepd003
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Extension of the SPIRAL2 PLC-based control system for the integration of DESIR and NEWGAIN

SPIRE - Sciences Po Institutional REpository
Particle accelerators and beam dynamics
article

Extension of the SPIRAL2 PLC-based control system for the integration of DESIR and NEWGAIN

article en

Abstract

The SPIRAL2 heavy ion accelerator is currently undergoing several extension projects under development. In Phase 1+, the DESIR experimental hall will receive very low energy radioactive ion beams from S3 or SPIRAL1. In Phase 1++, a new cryogenic ion source and a new injector will be implemented to broaden the range of heavy ions currently accelerated. This contribution presents the integration of these new facilities into the SPIRAL2 PLC-based control system. The integration builds on recent technological upgrades while maintaining system consistency and ensuring compliance with the specific constraints related to radiation protection and operational safety. Some existing PLCs have been extended, and new ones have been added to automate processes related to beam operation (machine protection system, equipment insertion, vacuum, RF, cryogenics), building infrastructure (nuclear ventilation, refrigeration, alarm management), and nuclear safety (access control units, radiation monitoring). This integrated approach ensures a coherent, maintainable control system that supports safe and efficient operations for the DESIR and Newgain projects.

SPIRE - Sciences Po Institutional REpository
Industry, innovation and infrastructure
Openalex Percentile: Top 29%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Extension of the SPIRAL2 PLC-based control system for the integration of DESIR and NEWGAIN · SPIRE - Sciences Po Institutional REpository (2025) | TGRS Research Map | TGRS