Development of an EPICS-based control platform for electron beam commissioning at ELI-NP

The ELI-NP (Extreme Light Infrastructure - Nuclear Physics) gamma beam system employs a 234-742 MeV linear accelerator to generate gamma rays via laser-electron interactions. Accelerator operation requires coordinated control of multiple subsystems (RF, vacuum, magnets, diagnostics). During pre-commissioning, we developed an EPICS-based platform to enable equipment debugging and beam tuning simulations before control system completion. The platform integrates both soft IOCs (for device emulation and algorithm validation) and device IOCs (for hardware control). This dual-IOC architecture allows: 1) High-level control software testing without physical hardware, and 2) Physics application interfaces for advanced functionality. The system successfully simulated control operations and supported tuning algorithm development. Testing demonstrated the platform's effectiveness for subsystem debugging and realistic beam tuning simulations. By bridging the gap between hardware availability and control system readiness, the platform is expected to accelerate the commissioning process and enhance the operational efficiency of the ELI-NP gamma beam system in the future.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-wepd005
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of an EPICS-based control platform for electron beam commissioning at ELI-NP

JACOW
Particle Accelerators and Free-Electron Lasers
article

Development of an EPICS-based control platform for electron beam commissioning at ELI-NP

article en

Abstract

The ELI-NP (Extreme Light Infrastructure - Nuclear Physics) gamma beam system employs a 234-742 MeV linear accelerator to generate gamma rays via laser-electron interactions. Accelerator operation requires coordinated control of multiple subsystems (RF, vacuum, magnets, diagnostics). During pre-commissioning, we developed an EPICS-based platform to enable equipment debugging and beam tuning simulations before control system completion. The platform integrates both soft IOCs (for device emulation and algorithm validation) and device IOCs (for hardware control). This dual-IOC architecture allows: 1) High-level control software testing without physical hardware, and 2) Physics application interfaces for advanced functionality. The system successfully simulated control operations and supported tuning algorithm development. Testing demonstrated the platform's effectiveness for subsystem debugging and realistic beam tuning simulations. By bridging the gap between hardware availability and control system readiness, the platform is expected to accelerate the commissioning process and enhance the operational efficiency of the ELI-NP gamma beam system in the future.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 47%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.