Automating x-ray beam alignment processes with the split and delay graphical user interface at the Linac Coherent Light Source

At SLAC National Accelerator Laboratory's Linac Coherent Light Source (LCLS), a series of optics and diodes in the X-ray Correlation Spectroscopy (XCS) beam line's split-and-delay chamber divide the beam into two equal intensity pulses. One pulse is intentionally delayed, facilitating X-ray Photon Correlation Spectroscopy techniques that operate at nanosecond time scales for experiments in biology, chemistry, and materials science. However, achieving precise beam alignment with this setup poses significant challenges because meticulous adjustments to each of the beam line optics are required in succession each time the split-and-delay chamber is used, and this process is very time and effort intensive. To address these challenges, the implementation of the split and delay graphical user interface (GUI) streamlines x-ray beam alignment by enabling remote control of the motorized optical components and displaying user-friendly, live-time monitoring of the beam diagnostics. Work is on-going to allow automatic optimization of beam alignment by stepping the motorized optical components through various positions, measuring the beam intensity, and moving optics on motorized stages to the preferred positions. This advancement will further streamline alignment of the beam through the split-and-delay chamber and thus increase time available for data collection at XCS.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-thpd066
Primary Topic
Advanced X-ray Imaging Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Automating x-ray beam alignment processes with the split and delay graphical user interface at the Linac Coherent Light Source

JACOW
Advanced X-ray Imaging Techniques
article

Automating x-ray beam alignment processes with the split and delay graphical user interface at the Linac Coherent Light Source

article en

Abstract

At SLAC National Accelerator Laboratory's Linac Coherent Light Source (LCLS), a series of optics and diodes in the X-ray Correlation Spectroscopy (XCS) beam line's split-and-delay chamber divide the beam into two equal intensity pulses. One pulse is intentionally delayed, facilitating X-ray Photon Correlation Spectroscopy techniques that operate at nanosecond time scales for experiments in biology, chemistry, and materials science. However, achieving precise beam alignment with this setup poses significant challenges because meticulous adjustments to each of the beam line optics are required in succession each time the split-and-delay chamber is used, and this process is very time and effort intensive. To address these challenges, the implementation of the split and delay graphical user interface (GUI) streamlines x-ray beam alignment by enabling remote control of the motorized optical components and displaying user-friendly, live-time monitoring of the beam diagnostics. Work is on-going to allow automatic optimization of beam alignment by stepping the motorized optical components through various positions, measuring the beam intensity, and moving optics on motorized stages to the preferred positions. This advancement will further streamline alignment of the beam through the split-and-delay chamber and thus increase time available for data collection at XCS.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 30%
Advanced X-ray Imaging Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Automating x-ray beam alignment processes with the split and delay graphical user interface at the Linac Coherent Light Source · JACOW (2025) | TGRS Research Map | TGRS