Controls of the new eddy current septum for the CERN PS fast extraction

The CERN PS fast extraction septum deflects protons and ions towards the experimental areas of the PS complex and the SPS. With the increased number of extractions per year since it was first put into service in 1994, the magnet lifetime is nowadays estimated at two years, implying bi-annual rebuilds of the septum, significant costs, and non-negligible radiation doses taken by personnel. Additionally, the present power converter is approaching its end-of-life. In view of its superior robustness, an eddy current septum system was chosen to replace the original direct-drive septum. Due to the different technology of the magnet, the existing power converter is replaced by a new fast pulse generator, which implies a complete new control system. This paper describes the different units and functionalities of this new control system, covering a wide range of technologies such as high-voltage switch triggering modules, slow interlocks based on PLC, fast interlocks and timing implemented in FPGAs, temperature-compensated acquisition chains, and software-based regulation algorithms. Preliminary results of the system performance are also presented.

Publication Details

Journal
International Linear Collider
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tupd019
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Controls of the new eddy current septum for the CERN PS fast extraction

International Linear Collider
Particle accelerators and beam dynamics
article

Controls of the new eddy current septum for the CERN PS fast extraction

article en

Abstract

The CERN PS fast extraction septum deflects protons and ions towards the experimental areas of the PS complex and the SPS. With the increased number of extractions per year since it was first put into service in 1994, the magnet lifetime is nowadays estimated at two years, implying bi-annual rebuilds of the septum, significant costs, and non-negligible radiation doses taken by personnel. Additionally, the present power converter is approaching its end-of-life. In view of its superior robustness, an eddy current septum system was chosen to replace the original direct-drive septum. Due to the different technology of the magnet, the existing power converter is replaced by a new fast pulse generator, which implies a complete new control system. This paper describes the different units and functionalities of this new control system, covering a wide range of technologies such as high-voltage switch triggering modules, slow interlocks based on PLC, fast interlocks and timing implemented in FPGAs, temperature-compensated acquisition chains, and software-based regulation algorithms. Preliminary results of the system performance are also presented.

International Linear Collider
Affordable and clean energy
Openalex Percentile: Top 29%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Controls of the new eddy current septum for the CERN PS fast extraction · International Linear Collider (2025) | TGRS Research Map | TGRS