ESS accelerator personnel safety system journey towards steady state operation

The European Spallation Source (ESS) Accelerator Personnel Safety System (ACC PSS) journey towards steady state operation has been a remarkable experience. ACC PSS serves the safety interlock and access control functionalities for the Linac. The safety interlock mitigates various hazards (ionising radiation, high voltage) associated with the proton beam operation and RF equipment. The access control is achieved by implementing an integrated access management, where a Personal Access Station (PAS) is merged with a Physical Access Control System (PACS), allowing fully automated passage. Thorough verification and validation have been performed to attain seamless operation. This paper provides lessons learned and investigations throughout the ESS ACC PSS commissioning journey.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-thmg004
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ESS accelerator personnel safety system journey towards steady state operation

JACOW
Particle accelerators and beam dynamics
article

ESS accelerator personnel safety system journey towards steady state operation

article en

Abstract

The European Spallation Source (ESS) Accelerator Personnel Safety System (ACC PSS) journey towards steady state operation has been a remarkable experience. ACC PSS serves the safety interlock and access control functionalities for the Linac. The safety interlock mitigates various hazards (ionising radiation, high voltage) associated with the proton beam operation and RF equipment. The access control is achieved by implementing an integrated access management, where a Personal Access Station (PAS) is merged with a Physical Access Control System (PACS), allowing fully automated passage. Thorough verification and validation have been performed to attain seamless operation. This paper provides lessons learned and investigations throughout the ESS ACC PSS commissioning journey.

JACOW
Openalex Percentile: Top 29%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

ESS accelerator personnel safety system journey towards steady state operation · JACOW (2025) | TGRS Research Map | TGRS