Bridging the Gap: Insights into Backtracking-Angle Related Discrepancies between Estimates and Actual Performance in Large-Scale Photovoltaic Plants

Energy yield overestimation in large-scale photovoltaic (PV) simulations is a recurring issue that affects the accuracy of performance predictions. Analysis of SCADA data from four single-axis PV plants in different regions revealed systematic deviations between simulated and measured tracker angles during backtracking periods, prompting an investigation into the role of the estimated tracking irradiation gain (TIG) in these discrepancies. These deviations seemed to be linked to empirical corrections implemented to mitigate shading caused by terrain unevenness, which introduces elevation differences between tracker rows. While these adjustments reduce shading losses, they also modify the trackers' optimal tilt, lowering incident irradiance and ultimately reducing energy yield. A reverse-engineering approach was used to derive an equivalent correction model, based on a theoretical reduction in the effective inter-row spacing. When implemented in simulation tools, this correction produced TIG values 7–10% lower than those predicted under ideal flat-terrain conditions, leading to annual energy yield overestimations of around 3%. The results underscore the importance of accounting for realistic tracking behavior in energy yield simulations to improve both technical accuracy and the financial predictability of PV projects.

Publication Details

Journal
EU PVSEC
Published
2025-11-20
DOI
https://doi.org/10.4229/eupvsec2025/4do.1.2
Primary Topic
Solar Radiation and Photovoltaics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Bridging the Gap: Insights into Backtracking-Angle Related Discrepancies between Estimates and Actual Performance in Large-Scale Photovoltaic Plants

EU PVSEC
Solar Radiation and Photovoltaics
article

Bridging the Gap: Insights into Backtracking-Angle Related Discrepancies between Estimates and Actual Performance in Large-Scale Photovoltaic Plants

article en

Abstract

Energy yield overestimation in large-scale photovoltaic (PV) simulations is a recurring issue that affects the accuracy of performance predictions. Analysis of SCADA data from four single-axis PV plants in different regions revealed systematic deviations between simulated and measured tracker angles during backtracking periods, prompting an investigation into the role of the estimated tracking irradiation gain (TIG) in these discrepancies. These deviations seemed to be linked to empirical corrections implemented to mitigate shading caused by terrain unevenness, which introduces elevation differences between tracker rows. While these adjustments reduce shading losses, they also modify the trackers' optimal tilt, lowering incident irradiance and ultimately reducing energy yield. A reverse-engineering approach was used to derive an equivalent correction model, based on a theoretical reduction in the effective inter-row spacing. When implemented in simulation tools, this correction produced TIG values 7–10% lower than those predicted under ideal flat-terrain conditions, leading to annual energy yield overestimations of around 3%. The results underscore the importance of accounting for realistic tracking behavior in energy yield simulations to improve both technical accuracy and the financial predictability of PV projects.

EU PVSEC
Affordable and clean energy
Openalex Percentile: Top 22%
Solar Radiation and Photovoltaics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.