METHOD OF PRELIMINARY CALCULATIONS FOR CREATION OF TEMPORARY RING MODES IN ELECTRICAL NETWORKS 6-10 kV

The work explores a preliminary calculation method to determine the possibility of switching on transformers for parallel operation and creating temporary ring modes in electrical networks of 6 - 10 kV, in order to ensure the transfer of electrical power to consumers without interruptions in power supply. Subject: of research: ring mode of operation of power transmission lines (PTLs) in electrically unconnected distribution networks of 6-10 kV. Materials and methods: the work first proposed a method for creating ring modes of power lines in 6-10 kV electrical networks receiving electrical power from different power centers, between which there is no possibility of creating a temporary electrical connection, by turning on a sectional switch or a separate shunt connection (repair jumper) , for subsequent creation of a ring mode. Results: using the method of preliminary calculations, results were obtained that allow a preliminary assessment of the possibility of creating a ring mode of 6-10 kV power lines between electrically unconnected power centers (CPs). Conclusions: the method proposed in the work for preliminary calculations of steady-state modes makes it possible to assess the possibility of creating a short-term ring mode in electrically unconnected 6-10 kV distribution networks.

Institutions

Publication Details

Journal
Construction and industrial safety
Published
2025-10-21
DOI
https://doi.org/10.29039/2413-1873-2025-38-29-36
Primary Topic
Electric Power Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

METHOD OF PRELIMINARY CALCULATIONS FOR CREATION OF TEMPORARY RING MODES IN ELECTRICAL NETWORKS 6-10 kV

Construction and industrial safety
Electric Power Systems and Control
article

METHOD OF PRELIMINARY CALCULATIONS FOR CREATION OF TEMPORARY RING MODES IN ELECTRICAL NETWORKS 6-10 kV

article en

Abstract

The work explores a preliminary calculation method to determine the possibility of switching on transformers for parallel operation and creating temporary ring modes in electrical networks of 6 - 10 kV, in order to ensure the transfer of electrical power to consumers without interruptions in power supply. Subject: of research: ring mode of operation of power transmission lines (PTLs) in electrically unconnected distribution networks of 6-10 kV. Materials and methods: the work first proposed a method for creating ring modes of power lines in 6-10 kV electrical networks receiving electrical power from different power centers, between which there is no possibility of creating a temporary electrical connection, by turning on a sectional switch or a separate shunt connection (repair jumper) , for subsequent creation of a ring mode. Results: using the method of preliminary calculations, results were obtained that allow a preliminary assessment of the possibility of creating a ring mode of 6-10 kV power lines between electrically unconnected power centers (CPs). Conclusions: the method proposed in the work for preliminary calculations of steady-state modes makes it possible to assess the possibility of creating a short-term ring mode in electrically unconnected 6-10 kV distribution networks.

Construction and industrial safetyVol. 0(38)
V.I. Vernadsky Crimean Federal University (UA)
Affordable and clean energy
Openalex Percentile: Top 48%
Electric Power Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.