Project Planning and the Performance of Public Project in Rwanda. A Case Study of DMIS Implemented by NCPD

Abstract: This study examined the effect of project planning on the performance of public projects in Rwanda, focusing on the Disability Management Information System (DMIS) project. The research aimed to assess how risk management planning, resource planning, and stakeholder engagement influence project performance. An explanatory mixed-methods design was employed, involving 92 respondents selected from 119 DMIS stakeholders using simple random sampling. Data were gathered through structured questionnaires containing both Likert-scale and open-ended questions. Quantitative data were analyzed using descriptive and inferential statistics, while qualitative responses underwent thematic analysis. Findings revealed strong positive correlations between the three planning components and DMIS project performance. Risk management planning showed the highest influence (r = 0.781, p < 0.001), explaining 61% of performance variance, followed by resource planning (r = 0.764, p < 0.001; 58%) and stakeholder engagement (r = 0.732, p < 0.001; 54%). The combined regression model was significant (F(3,88) = 72.614, p < 0.001), with an adjusted R² of 0.713, indicating that the three variables jointly explained 71.3% of the variation in project performance. Qualitative findings supported these results, emphasizing the importance of proactive risk identification, efficient resource allocation, and inclusive stakeholder participation in achieving timely, budget-compliant, and high-quality project outcomes. The study concludes that comprehensive project planning—encompassing strong risk management, effective resource planning, and stakeholder engagement—is a key determinant of successful public project performance in Rwanda. Keywords: Project Planning, Performance, Public Project, DMIS, NCPD, Rwanda. Title: Project Planning and the Performance of Public Project in Rwanda. A Case Study of DMIS Implemented by NCPD Author: Tugirimana Jean Claude, Dr Osiemo Kengere International Journal of Management and Commerce Innovations ISSN 2348-7585 (Online) Vol. 13, Issue 2, October 2025 - March 2026 Page No: 122-134 Research Publish Journals Website: www.researchpublish.com Published Date: 13-November-2025 DOI: https://doi.org/10.5281/zenodo.17600091 Paper Download Link (Source) https://www.researchpublish.com/papers/project-planning-and-the-performance-of-public-project-in-rwanda--a-case-study-of-dmis-implemented-by-ncpd

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-11-13
DOI
https://doi.org/10.5281/zenodo.17600091
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Project Planning and the Performance of Public Project in Rwanda. A Case Study of DMIS Implemented by NCPD

Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Project Planning and the Performance of Public Project in Rwanda. A Case Study of DMIS Implemented by NCPD

article en

Abstract

Abstract: This study examined the effect of project planning on the performance of public projects in Rwanda, focusing on the Disability Management Information System (DMIS) project. The research aimed to assess how risk management planning, resource planning, and stakeholder engagement influence project performance. An explanatory mixed-methods design was employed, involving 92 respondents selected from 119 DMIS stakeholders using simple random sampling. Data were gathered through structured questionnaires containing both Likert-scale and open-ended questions. Quantitative data were analyzed using descriptive and inferential statistics, while qualitative responses underwent thematic analysis. Findings revealed strong positive correlations between the three planning components and DMIS project performance. Risk management planning showed the highest influence (r = 0.781, p < 0.001), explaining 61% of performance variance, followed by resource planning (r = 0.764, p < 0.001; 58%) and stakeholder engagement (r = 0.732, p < 0.001; 54%). The combined regression model was significant (F(3,88) = 72.614, p < 0.001), with an adjusted R² of 0.713, indicating that the three variables jointly explained 71.3% of the variation in project performance. Qualitative findings supported these results, emphasizing the importance of proactive risk identification, efficient resource allocation, and inclusive stakeholder participation in achieving timely, budget-compliant, and high-quality project outcomes. The study concludes that comprehensive project planning—encompassing strong risk management, effective resource planning, and stakeholder engagement—is a key determinant of successful public project performance in Rwanda. Keywords: Project Planning, Performance, Public Project, DMIS, NCPD, Rwanda. Title: Project Planning and the Performance of Public Project in Rwanda. A Case Study of DMIS Implemented by NCPD Author: Tugirimana Jean Claude, Dr Osiemo Kengere International Journal of Management and Commerce Innovations ISSN 2348-7585 (Online) Vol. 13, Issue 2, October 2025 - March 2026 Page No: 122-134 Research Publish Journals Website: www.researchpublish.com Published Date: 13-November-2025 DOI: https://doi.org/10.5281/zenodo.17600091 Paper Download Link (Source) https://www.researchpublish.com/papers/project-planning-and-the-performance-of-public-project-in-rwanda--a-case-study-of-dmis-implemented-by-ncpd

Zenodo (CERN European Organization for Nuclear Research)
Openalex Percentile: Top 37%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Project Planning and the Performance of Public Project in Rwanda. A Case Study of DMIS Implemented by NCPD · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS