Third order resonance correction using new Trim-S system in J-PARC MR
In the Japan Proton Accelerator Research Complex (J-PARC) Main Ring (MR), to address the issue of resonance correction for third-order resonances in both on- and off-momentum particles, an upgrade project utilizing 24 Trim-S units has been proposed based on numerical simulations. As a first step in verifying its effectiveness, four additional Trim-S (new Trim-S) power supplies, configured with a System-on-Chip (SoC) Field Programmable Gate Array (FPGA) controller, have been installed. The performance of the new system was experimentally verified by correcting the resonance using these 4 new Trim-S units. Beam loss was successfully reduced compared to that with the original Trim-S system, demonstrating the effectiveness of the new system.
Publication Details
- Journal
- JACOW
- Published
- 2025-11-05
- DOI
- https://doi.org/10.18429/jacow-ipac2025-wepb042
- Primary Topic
- Particle accelerators and beam dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00