Assembly of the IFMIF SRF Linac cryomodule

Complementing its contributions to the JT-60SA and ITER fusion reactors, Fusion for Energy contributes to the R&D for material characterization facilities. Under the Broader Approach agreement, Europe and Japan are developing the Linear IFMIF Prototype Accelerator (LIPAc) in Japan, a deuteron accelerator demonstrator producing neutrons by nuclear stripping reactions on a liquid lithium target, part of the International Fusion Materials Irradiation Facility (IFMIF) project. In 2024, LIPAC prepared for the installation of the SRF cryomodule, concluding its construction. As first prototype, the cryomodule assembly faced challenges at various stages. Started in March 2019, the assembly was paused during its cleanroom phase due to quality issues with the superconducting solenoids, resuming in Aug. 2022. Further issues delayed the completion of the cleanroom activities until Sept. 2024. In 2024, the cryomodule assembly progressed at a good rate. The clean room worked concluded in Sept. and by late 2024 the cold mass was ready for insertion into the vacuum vessel, with transfer to the vault planned for early 2025. In this paper, we will outline the critical steps of this assembly process.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-tups062
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assembly of the IFMIF SRF Linac cryomodule

JACOW
Superconducting Materials and Applications
article

Assembly of the IFMIF SRF Linac cryomodule

article en

Abstract

Complementing its contributions to the JT-60SA and ITER fusion reactors, Fusion for Energy contributes to the R&D for material characterization facilities. Under the Broader Approach agreement, Europe and Japan are developing the Linear IFMIF Prototype Accelerator (LIPAc) in Japan, a deuteron accelerator demonstrator producing neutrons by nuclear stripping reactions on a liquid lithium target, part of the International Fusion Materials Irradiation Facility (IFMIF) project. In 2024, LIPAC prepared for the installation of the SRF cryomodule, concluding its construction. As first prototype, the cryomodule assembly faced challenges at various stages. Started in March 2019, the assembly was paused during its cleanroom phase due to quality issues with the superconducting solenoids, resuming in Aug. 2022. Further issues delayed the completion of the cleanroom activities until Sept. 2024. In 2024, the cryomodule assembly progressed at a good rate. The clean room worked concluded in Sept. and by late 2024 the cold mass was ready for insertion into the vacuum vessel, with transfer to the vault planned for early 2025. In this paper, we will outline the critical steps of this assembly process.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 49%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Assembly of the IFMIF SRF Linac cryomodule · JACOW (2025) | TGRS Research Map | TGRS