The operational challenges: Achieving 500 mA high beam current at Taiwan Photon Source

The Taiwan Photon Source (TPS) has been in routine operation at 500 mA since the last season of 2021, utilizing two superconducting cavities, bunch by bunch feedback system, and fast orbit feedback system, along with many technical efforts. The operation of TPS maintains its high reliability and availability. The mean time between failures is more than 190 hours with an availability greater than 98.9% in 2023. With newly developed cryogenic permanent magnet undulators, IVUs, and EPUs, balancing the needs of both soft X-ray and hard X-ray users. Many challenges have been encountered in the journey to achieving a beam current of 500 mA, primarily due to the short bunch length of 16 ps and impedance issues in vacuum chambers at TPS storage ring. Ongoing efforts to improve the performance and the detailed journey to achieving 500 mA top-up operation will be presented.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-moxp1
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The operational challenges: Achieving 500 mA high beam current at Taiwan Photon Source

JACOW
Particle Accelerators and Free-Electron Lasers
article

The operational challenges: Achieving 500 mA high beam current at Taiwan Photon Source

article en

Abstract

The Taiwan Photon Source (TPS) has been in routine operation at 500 mA since the last season of 2021, utilizing two superconducting cavities, bunch by bunch feedback system, and fast orbit feedback system, along with many technical efforts. The operation of TPS maintains its high reliability and availability. The mean time between failures is more than 190 hours with an availability greater than 98.9% in 2023. With newly developed cryogenic permanent magnet undulators, IVUs, and EPUs, balancing the needs of both soft X-ray and hard X-ray users. Many challenges have been encountered in the journey to achieving a beam current of 500 mA, primarily due to the short bunch length of 16 ps and impedance issues in vacuum chambers at TPS storage ring. Ongoing efforts to improve the performance and the detailed journey to achieving 500 mA top-up operation will be presented.

JACOW
Openalex Percentile: Top 48%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.