Vacuum system of MAX4U – an upgrade of MAX IV 3 GeV storage ring

MAX 4U is an upgrade project of the MAX IV 3 GeV storage ring, to be realized by the early 2030’s in Lund, Sweden. The goal of the upgrade is to reduce the horizontal electron beam emittance to below 100 pm.rad. A new magnet lattice will be used, thus the vacuum system will have to be adapted to follow the new beam orbit of MAX 4U. Several lattices imposing the most severe changes to the beam orbit were studied. One proposal for the MAX 4U vacuum system is to re-use and adapt under vacuum the shape of the MAX IV 3 GeV ring vacuum chambers (coated with non-evaporable getter (NEG) thin film) by bending-to fit to the new magnet lattice. In such scenario, the vacuum system will not be vented, thus the NEG coating will not have to be re-activated. Such approach is very cost-effective and reduces the installation and commissioning time to the minimum. This scenario is presented here, together with the performed simulations, validation studies and tests.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-thpb002
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Vacuum system of MAX4U – an upgrade of MAX IV 3 GeV storage ring

JACOW
Particle Accelerators and Free-Electron Lasers
article

Vacuum system of MAX4U – an upgrade of MAX IV 3 GeV storage ring

article en

Abstract

MAX 4U is an upgrade project of the MAX IV 3 GeV storage ring, to be realized by the early 2030’s in Lund, Sweden. The goal of the upgrade is to reduce the horizontal electron beam emittance to below 100 pm.rad. A new magnet lattice will be used, thus the vacuum system will have to be adapted to follow the new beam orbit of MAX 4U. Several lattices imposing the most severe changes to the beam orbit were studied. One proposal for the MAX 4U vacuum system is to re-use and adapt under vacuum the shape of the MAX IV 3 GeV ring vacuum chambers (coated with non-evaporable getter (NEG) thin film) by bending-to fit to the new magnet lattice. In such scenario, the vacuum system will not be vented, thus the NEG coating will not have to be re-activated. Such approach is very cost-effective and reduces the installation and commissioning time to the minimum. This scenario is presented here, together with the performed simulations, validation studies and tests.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 48%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.