Reliability analysis of the new Beam Interlock System for CERN’s accelerator complex

The Beam Interlock System is a key element of machine protection in CERN’s accelerators. It provides a fast and reliable way to link the accelerator systems to the beam dumping system, which ensures the safe extraction of the beams. This paper presents the reliability study of the new Beam Interlock System, which will replace the current system and will be deployed during CERN’s Long Shutdown 3. The upgrade features many improvements while maintaining the proven architecture of the previous system. In the study, each of the system’s boards were analysed through a detailed, component-level FMECA. This approach quantifies all operational risks, as well as identifies the most critical components. The risk on the system level is estimated using a global reliability model, which establishes functional dependencies between individual boards. It accounts for system-level redundancies, inspection and maintenance strategies. The results show that the stringent reliability requirements, set in the view of possible catastrophic damages to the equipment in case of malfunction, are met with safety margins. They also highlight the importance of appropriate maintenance, testing and monitoring.

Publication Details

Journal
CERN Bulletin
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-thps026
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reliability analysis of the new Beam Interlock System for CERN’s accelerator complex

CERN Bulletin
Particle Accelerators and Free-Electron Lasers
article

Reliability analysis of the new Beam Interlock System for CERN’s accelerator complex

article en

Abstract

The Beam Interlock System is a key element of machine protection in CERN’s accelerators. It provides a fast and reliable way to link the accelerator systems to the beam dumping system, which ensures the safe extraction of the beams. This paper presents the reliability study of the new Beam Interlock System, which will replace the current system and will be deployed during CERN’s Long Shutdown 3. The upgrade features many improvements while maintaining the proven architecture of the previous system. In the study, each of the system’s boards were analysed through a detailed, component-level FMECA. This approach quantifies all operational risks, as well as identifies the most critical components. The risk on the system level is estimated using a global reliability model, which establishes functional dependencies between individual boards. It accounts for system-level redundancies, inspection and maintenance strategies. The results show that the stringent reliability requirements, set in the view of possible catastrophic damages to the equipment in case of malfunction, are met with safety margins. They also highlight the importance of appropriate maintenance, testing and monitoring.

CERN Bulletin
Openalex Percentile: Top 48%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Reliability analysis of the new Beam Interlock System for CERN’s accelerator complex · CERN Bulletin (2025) | TGRS Research Map | TGRS