Compiling a life cycle inventory of a large accelerator facility: The ISIS-II neutron and muon source life cycle assessment

The ISIS-II Neutron and Muon Source, the proposed successor to the ISIS Neutron and Muon Source at the Rutherford Appleton Laboratory, UK, presents a unique opportunity to integrate environmental sustainability practises from its inception. A Life Cycle Assessment (LCA) was performed during the early feasibility and design stage to evaluate the potential environmental impacts across construction, operation, and decommissioning phases, and to identify opportunities for impact reduction. With many accelerator components, elements and systems still in early optioneering stages, numerous assumptions were required to model the facility. This work explores these assumptions and the use of a simplified LCA framework, focusing on bulk material selection, future operational resource management, and strategies for managing non-radioactive and radioactive materials at decommissioning. Updated results of the LCA and identified strategies to minimize and mitigate negative environmental impacts are presented, emphasizing the role of LCAs in embedding sustainability into decision-making for large-scale scientific facilities.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-thpb053
Primary Topic
Graphite, nuclear technology, radiation studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Compiling a life cycle inventory of a large accelerator facility: The ISIS-II neutron and muon source life cycle assessment

JACOW
Graphite, nuclear technology, radiation studies
article

Compiling a life cycle inventory of a large accelerator facility: The ISIS-II neutron and muon source life cycle assessment

article en

Abstract

The ISIS-II Neutron and Muon Source, the proposed successor to the ISIS Neutron and Muon Source at the Rutherford Appleton Laboratory, UK, presents a unique opportunity to integrate environmental sustainability practises from its inception. A Life Cycle Assessment (LCA) was performed during the early feasibility and design stage to evaluate the potential environmental impacts across construction, operation, and decommissioning phases, and to identify opportunities for impact reduction. With many accelerator components, elements and systems still in early optioneering stages, numerous assumptions were required to model the facility. This work explores these assumptions and the use of a simplified LCA framework, focusing on bulk material selection, future operational resource management, and strategies for managing non-radioactive and radioactive materials at decommissioning. Updated results of the LCA and identified strategies to minimize and mitigate negative environmental impacts are presented, emphasizing the role of LCAs in embedding sustainability into decision-making for large-scale scientific facilities.

JACOW
Responsible consumption and production
Openalex Percentile: Top 57%
Graphite, nuclear technology, radiation studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.