Progress on the 5BA lattice studies for ALBA-II

ALBA-II is progressing in the definition of an upgrade lattice that meets the requirements of the beamlines and perform well in terms of dynamics aperture and lifetime. The last changes were focused on further decreasing both the emittance (200 pm*rad) and the beta functions at the straight sections (around 2 m) for the improvement of the beamlines performances. The efforts to guarantee a good performance of such a lattice have been focused on the improvement of a horizontal dynamic aperture larger than 6 mm (needed for off-axis injection) and of a lifetime around 10 hours. Octupole magnets next to each sextupole have been introduced to correct the large tune shift with amplitude that is limiting the dynamic aperture. Simulations of the lattice commissioning and robustness with magnet, alignment and instrumentation errors are being carried out. The efficiency of the off-axis injection process including both lattice and pulsed elements errors is also under evaluation.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-wepm105
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Progress on the 5BA lattice studies for ALBA-II

JACOW
Particle Accelerators and Free-Electron Lasers
article

Progress on the 5BA lattice studies for ALBA-II

article en

Abstract

ALBA-II is progressing in the definition of an upgrade lattice that meets the requirements of the beamlines and perform well in terms of dynamics aperture and lifetime. The last changes were focused on further decreasing both the emittance (200 pm*rad) and the beta functions at the straight sections (around 2 m) for the improvement of the beamlines performances. The efforts to guarantee a good performance of such a lattice have been focused on the improvement of a horizontal dynamic aperture larger than 6 mm (needed for off-axis injection) and of a lifetime around 10 hours. Octupole magnets next to each sextupole have been introduced to correct the large tune shift with amplitude that is limiting the dynamic aperture. Simulations of the lattice commissioning and robustness with magnet, alignment and instrumentation errors are being carried out. The efficiency of the off-axis injection process including both lattice and pulsed elements errors is also under evaluation.

JACOW
Openalex Percentile: Top 48%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.