An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-tupm114
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An extraction scheme for future CEBAF FFA based energy upgrade

JACOW
Particle Accelerators and Free-Electron Lasers
article

An extraction scheme for future CEBAF FFA based energy upgrade

article en

Abstract

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

JACOW
Affordable and clean energy
Openalex Percentile: Top 48%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.