A muon beam facility at CERN to demonstrate muon ionisation cooling

The International Muon Collider Collaboration (IMCC) has been formed following the 2020 European Strategy for Particle Physics Update, with the goal of studying the feasibility of a muon collider at a centre of mass energy of around 10 TeV. One of the most challenging sections of a muon collider is the initial cooling before acceleration, due to the necessity to apply intense magnetic and electric fields to reduce the 6D emittance of the muon beam by 5 orders of magnitude in a very short time, to cope with the limited lifetime of muons (2.2 μs at rest). The IMCC proposes to build a Demonstrator to prove that all the involved technologies (RF, magnets, absorbers, beam instrumentation) can be built at the required specifications, and integrated in order to limit the length of the cooling sections to an acceptable value. Several options are being considered in different laboratories within the collaboration. This paper describes a possible implementation at CERN, in the existing TT7 tunnel.

Publication Details

Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-mops115
Primary Topic
Neutrino Physics Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A muon beam facility at CERN to demonstrate muon ionisation cooling

Neutrino Physics Research
article

A muon beam facility at CERN to demonstrate muon ionisation cooling

article en

Abstract

The International Muon Collider Collaboration (IMCC) has been formed following the 2020 European Strategy for Particle Physics Update, with the goal of studying the feasibility of a muon collider at a centre of mass energy of around 10 TeV. One of the most challenging sections of a muon collider is the initial cooling before acceleration, due to the necessity to apply intense magnetic and electric fields to reduce the 6D emittance of the muon beam by 5 orders of magnitude in a very short time, to cope with the limited lifetime of muons (2.2 μs at rest). The IMCC proposes to build a Demonstrator to prove that all the involved technologies (RF, magnets, absorbers, beam instrumentation) can be built at the required specifications, and integrated in order to limit the length of the cooling sections to an acceptable value. Several options are being considered in different laboratories within the collaboration. This paper describes a possible implementation at CERN, in the existing TT7 tunnel.

Openalex Percentile: Top 28%
Neutrino Physics Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A muon beam facility at CERN to demonstrate muon ionisation cooling · (2025) | TGRS Research Map | TGRS