The European Spallation Source (ESS), currently under construction in Lund, Sweden, is designed to be the brightest neutron source in the world. It will be driven by a superconducting proton linac with a design beam power of 5 MW and energy of 2 GeV. The construction and installation of the linac are completed for the initial user operation envisaged in 2026 with capability of 2 MW beam power and 800 MeV energy. Beam commissioning of the full linac up to the dump in the line of eyesight is planned in early 2025. At this stage, the main focus will be on establishing optimal transport of 800 MeV beam as well as validating the critical components such as the RF system, diagnostics devices and machine protection systems. This contribution presents the highlights from this commissioning phase that will send the beam through the superconducting linac of ESS for the first time.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-tups056
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

First beam through the superconducting linac of European Spallation Source

JACOW
Particle accelerators and beam dynamics
article

First beam through the superconducting linac of European Spallation Source

article en

Abstract

The European Spallation Source (ESS), currently under construction in Lund, Sweden, is designed to be the brightest neutron source in the world. It will be driven by a superconducting proton linac with a design beam power of 5 MW and energy of 2 GeV. The construction and installation of the linac are completed for the initial user operation envisaged in 2026 with capability of 2 MW beam power and 800 MeV energy. Beam commissioning of the full linac up to the dump in the line of eyesight is planned in early 2025. At this stage, the main focus will be on establishing optimal transport of 800 MeV beam as well as validating the critical components such as the RF system, diagnostics devices and machine protection systems. This contribution presents the highlights from this commissioning phase that will send the beam through the superconducting linac of ESS for the first time.

JACOW
Affordable and clean energy
Openalex Percentile: Top 32%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.