RF power margin for operation with fixed-target in the CERN SPS

The CERN Super Proton Synchrotron (SPS) Radio Frequency (RF) system was upgraded as part of the Large Hadron Collider Injector Upgrade (LIU) project, and now comprises six 200 MHz travelling wave structures, each fed by a separate RF power amplifier. While the upgrade was targeting the peak power for capture and acceleration of the beams for the High Luminosity LHC, it also brought an increase in the available average power for fixed-target beams. The additional power introduced margins which were first probed and exploited in 2024, when the SPS RF system had to be operated at majorly reduced power, during failures that blocked a single power amplifier or accelerating structure. Specific examples from the 2024 run are given, together with the mitigation measures. This contribution summarizes the efforts and results, highlighting in particular the improvements needed for the control of the RF voltage for easier switching to the degraded mode of operation and back, as well as the impact of the impedance of an undriven cavity.

Publication Details

Journal
CERN Bulletin
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-tups027
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RF power margin for operation with fixed-target in the CERN SPS

CERN Bulletin
Particle Accelerators and Free-Electron Lasers
article

RF power margin for operation with fixed-target in the CERN SPS

article en

Abstract

The CERN Super Proton Synchrotron (SPS) Radio Frequency (RF) system was upgraded as part of the Large Hadron Collider Injector Upgrade (LIU) project, and now comprises six 200 MHz travelling wave structures, each fed by a separate RF power amplifier. While the upgrade was targeting the peak power for capture and acceleration of the beams for the High Luminosity LHC, it also brought an increase in the available average power for fixed-target beams. The additional power introduced margins which were first probed and exploited in 2024, when the SPS RF system had to be operated at majorly reduced power, during failures that blocked a single power amplifier or accelerating structure. Specific examples from the 2024 run are given, together with the mitigation measures. This contribution summarizes the efforts and results, highlighting in particular the improvements needed for the control of the RF voltage for easier switching to the degraded mode of operation and back, as well as the impact of the impedance of an undriven cavity.

CERN Bulletin
Affordable and clean energy
Openalex Percentile: Top 48%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

RF power margin for operation with fixed-target in the CERN SPS · CERN Bulletin (2025) | TGRS Research Map | TGRS