Renovation of the technical gallery network at CERN

The distribution of services throughout a large scientific facility like CERN relies on a 14-km-long network of technical galleries. They provide essential utilities to CERN's office buildings and technical facilities, such as hot water, drinking water, compressed air, gas and electrical supply. This network has been gradually expanded or partially discontinued based on the Laboratory's needs. After 60 years of service, it is now time to refurbish the galleries and their associated infrastructure, to address existing issues and establish a robust foundation for the organization's future endeavors. A dedicated project has therefore been launched to enhance the maintainability, reliability, overall safety, and environmental performance of the technical infrastructure. Adapting all the networks to current and future needs following modern standards while minimizing service disruptions is also a priority. This paper provides insight into the methodology developed to re-engineer the targeted areas, the results of design studies, and lessons learned from implemented improvements. These insights may serve as a valuable example for other consolidation projects within CERN and beyond.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-thps023
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Renovation of the technical gallery network at CERN

JACOW
Superconducting Materials and Applications
article

Renovation of the technical gallery network at CERN

article en

Abstract

The distribution of services throughout a large scientific facility like CERN relies on a 14-km-long network of technical galleries. They provide essential utilities to CERN's office buildings and technical facilities, such as hot water, drinking water, compressed air, gas and electrical supply. This network has been gradually expanded or partially discontinued based on the Laboratory's needs. After 60 years of service, it is now time to refurbish the galleries and their associated infrastructure, to address existing issues and establish a robust foundation for the organization's future endeavors. A dedicated project has therefore been launched to enhance the maintainability, reliability, overall safety, and environmental performance of the technical infrastructure. Adapting all the networks to current and future needs following modern standards while minimizing service disruptions is also a priority. This paper provides insight into the methodology developed to re-engineer the targeted areas, the results of design studies, and lessons learned from implemented improvements. These insights may serve as a valuable example for other consolidation projects within CERN and beyond.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 50%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Renovation of the technical gallery network at CERN · JACOW (2025) | TGRS Research Map | TGRS