Status of VEPP-5 injection complex
The VEPP-5 injection complex was put into operation as a source of electronic and positron beams for the VEPP-2000 and VEPP-4M colliders at the end of 2016. To date, an operating energy of 430 MeV and a positron accumulation rate of 3.5 nC/s have been achieved. Options for improving the complex for working with promising installations are being considered. The latest results and prospects of operation are presented.
Publication Details
- Journal
- JACOW
- Published
- 2025-11-05
- DOI
- https://doi.org/10.18429/jacow-ipac2025-mops139
- Primary Topic
- Crystallography and Radiation Phenomena
- Type
- article
- Field-Weighted Citation Impact
- 0.00