Status of construction of the new heavy ion synchrotron SIS100 at FAIR

The construction of the new FAIR heavy ion accelerator facility at GSI is progressing well. With the start of installation of SIS100 an important new milestone in project execusion has been reached. SIS100 is the first superconducting, fast ramped synchrotron with special design features dedicated to the acceleration of high intensity, low charge state heavy ions. The full performance of the specific functional systems, stabilizing the dynamic vacuum at operation with high Uranium intensities in combination with high repetition rates, was recently demonstrated at the SIS100 string test. Even under the influence of eddy current heating of the chamber walls at high ramp rates, its separatly cooled cryogenic vacuum system assures a stabilization of the residual gas pressure at extremely low values. The first straight sectors and arc modules have been installed heading towards a first hardware commissioning in 2026.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-mopm107
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Status of construction of the new heavy ion synchrotron SIS100 at FAIR

JACOW
Superconducting Materials and Applications
article

Status of construction of the new heavy ion synchrotron SIS100 at FAIR

article en

Abstract

The construction of the new FAIR heavy ion accelerator facility at GSI is progressing well. With the start of installation of SIS100 an important new milestone in project execusion has been reached. SIS100 is the first superconducting, fast ramped synchrotron with special design features dedicated to the acceleration of high intensity, low charge state heavy ions. The full performance of the specific functional systems, stabilizing the dynamic vacuum at operation with high Uranium intensities in combination with high repetition rates, was recently demonstrated at the SIS100 string test. Even under the influence of eddy current heating of the chamber walls at high ramp rates, its separatly cooled cryogenic vacuum system assures a stabilization of the residual gas pressure at extremely low values. The first straight sectors and arc modules have been installed heading towards a first hardware commissioning in 2026.

JACOW
Openalex Percentile: Top 50%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.