Plan for the KOMAC proton linac upgrade to 200 MeV

A 100-MeV proton linac has been operated for over 10 years at KOMAC and used for proton beam services. We are planning to upgrade the linac energy to 200-MeV. By increasing the linac beam energy, we expect the machine to be capable of serving wider application fields including space radiation tests of semiconductor devices and material tests by using high-energy neutrons generated by bombarding a proton beam to a solid target. For the energy upgrade, we consider the SDTL structure for the 200-MeV section. The structure of SDTL is relatively simple so we may reduce the risk and time of development. In addition, we can avoid complex cryogenic systems by choosing a normal conducting approach. For the beamline, two separate target rooms (one for proton, and the other for proton and neutron irradiation) are under design. Details of the planning activity for the KOMAC linac upgrade will be reported in this presentation.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-mops095
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Plan for the KOMAC proton linac upgrade to 200 MeV

JACOW
Particle accelerators and beam dynamics
article

Plan for the KOMAC proton linac upgrade to 200 MeV

article en

Abstract

A 100-MeV proton linac has been operated for over 10 years at KOMAC and used for proton beam services. We are planning to upgrade the linac energy to 200-MeV. By increasing the linac beam energy, we expect the machine to be capable of serving wider application fields including space radiation tests of semiconductor devices and material tests by using high-energy neutrons generated by bombarding a proton beam to a solid target. For the energy upgrade, we consider the SDTL structure for the 200-MeV section. The structure of SDTL is relatively simple so we may reduce the risk and time of development. In addition, we can avoid complex cryogenic systems by choosing a normal conducting approach. For the beamline, two separate target rooms (one for proton, and the other for proton and neutron irradiation) are under design. Details of the planning activity for the KOMAC linac upgrade will be reported in this presentation.

JACOW
Affordable and clean energy
Openalex Percentile: Top 32%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.