Design and development of an extraction septum for the MYRRHA 100 MeV proton target facility

SCK CEN is developing MYRRHA, a large-scale Accelerator Driven System. MYRRHA shall be a subcritical nuclear reactor driven by a high-power linear proton accelerator, which sustains the nuclear reaction. In the initial phase, known as the MINERVA project, the goal is to demonstrate the high reliability requirements on the accelerator. The two primary end users of the MINERVA project are the Full Power Facility and the Proton Target Facility. In collaboration with SCK CEN, CERN studied and designed an extraction septum for the 100 MeV Proton Target Facility. Two distinct topologies have been evaluated magnetically and tracked particle simulations have been executed to validate the designs. A preferred low-power solution has been retained for a subsequent detailed design. A final magnetic verification to confirm the mechanical design requirements has been carried out. This has allowed to develop a detailed 3D mechanical design including all manufacturing tolerances required for subcontracting the magnet fabrication to the industry. This article covers the 2- and 3-dimensional magnetic modelling, the tracked particle simulations and the mechanical design of the septum magnet.

Publication Details

Journal
JACOW
Published
2025-11-05
DOI
https://doi.org/10.18429/jacow-ipac2025-wepb085
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and development of an extraction septum for the MYRRHA 100 MeV proton target facility

JACOW
Superconducting Materials and Applications
article

Design and development of an extraction septum for the MYRRHA 100 MeV proton target facility

article en

Abstract

SCK CEN is developing MYRRHA, a large-scale Accelerator Driven System. MYRRHA shall be a subcritical nuclear reactor driven by a high-power linear proton accelerator, which sustains the nuclear reaction. In the initial phase, known as the MINERVA project, the goal is to demonstrate the high reliability requirements on the accelerator. The two primary end users of the MINERVA project are the Full Power Facility and the Proton Target Facility. In collaboration with SCK CEN, CERN studied and designed an extraction septum for the 100 MeV Proton Target Facility. Two distinct topologies have been evaluated magnetically and tracked particle simulations have been executed to validate the designs. A preferred low-power solution has been retained for a subsequent detailed design. A final magnetic verification to confirm the mechanical design requirements has been carried out. This has allowed to develop a detailed 3D mechanical design including all manufacturing tolerances required for subcontracting the magnet fabrication to the industry. This article covers the 2- and 3-dimensional magnetic modelling, the tracked particle simulations and the mechanical design of the septum magnet.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 50%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Design and development of an extraction septum for the MYRRHA 100 MeV proton target facility · JACOW (2025) | TGRS Research Map | TGRS