Magnet assembly of IVUE32 in-vacuum-APPLE II at BESSY II
At HZB / BESSY II the first in-vacuum APPLE II undu-lator is under construction. The design includes three magnet arrays for each of the four magnet rows for an efficient force compensation. The support and drive sys-tem has been delivered. Currently the magnets for the 10-period prototype are fabricated by Vacuumschmelze. Within the project IVUE32 a new soldering technique based on reactive foils has been developed in collabora-tion with Vacuumschmelze. The magnet structure of the IVUE32 undulator will employ the soldering technique aiming for enhanced assembly simplicity. Two new ex-perimental setups for the characterization of soldered subassemblies have been built for obtaining stress-strain curves and for lifetime (fatigue) tests. These instruments will be presented and measurements will be discussed.
Publication Details
- Journal
- JACOW
- Published
- 2025-11-05
- DOI
- https://doi.org/10.18429/jacow-ipac2025-mops055
- Primary Topic
- Superconducting Materials and Applications
- Type
- article
- Field-Weighted Citation Impact
- 0.00