Design, CPM-Based Scheduling, and Economic Evaluation of a Rooftop Solar Energy System in the Bursa Free Zone

ABSTRACT This study addresses the rising energy costs and carbon emission challenges by designing a solar energy system to meet energy demands in the Bursa Free Zone, aligning with sustainability and governmental energy efficiency standards. Rooftops of industrial facilities were evaluated as installation sites for photovoltaic (PV) systems. Using tools such as PV-SOL, PVsyst, and SketchUp, feasibility reports were prepared, and a 1,558-kWh capacity solar system was proposed. This system is expected to generate approximately 2,111,405 kWh of electricity annually. In addition to the technical design, a detailed project scheduling and optimization process was conducted using the Critical Path Method (CPM). The goal was to identify critical project activities and evaluate the potential for duration reduction. Project crashing scenarios were analysed using QM for Windows V5 and LINGO optimization software. Among several scenarios, the most efficient was shortening the project duration by one month at an additional cost of $8,725, offering the best time-cost trade-off. The engineering economic analysis was conducted in parallel, evaluating the project's financial performance over a 25-year lifecycle. Key metrics such as payback period and net present value (NPV) were calculated. The study also examined the financial benefits of project acceleration. This integrated approach—combining solar energy system design, CPM-based project scheduling, optimization software, and engineering economics—provides a comprehensive framework for sustainable energy implementation and efficient project management.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-11-05
DOI
https://doi.org/10.5281/zenodo.17530858
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design, CPM-Based Scheduling, and Economic Evaluation of a Rooftop Solar Energy System in the Bursa Free Zone

Zenodo (CERN European Organization for Nuclear Research)
Resource-Constrained Project Scheduling
article

Design, CPM-Based Scheduling, and Economic Evaluation of a Rooftop Solar Energy System in the Bursa Free Zone

article en

Abstract

ABSTRACT This study addresses the rising energy costs and carbon emission challenges by designing a solar energy system to meet energy demands in the Bursa Free Zone, aligning with sustainability and governmental energy efficiency standards. Rooftops of industrial facilities were evaluated as installation sites for photovoltaic (PV) systems. Using tools such as PV-SOL, PVsyst, and SketchUp, feasibility reports were prepared, and a 1,558-kWh capacity solar system was proposed. This system is expected to generate approximately 2,111,405 kWh of electricity annually. In addition to the technical design, a detailed project scheduling and optimization process was conducted using the Critical Path Method (CPM). The goal was to identify critical project activities and evaluate the potential for duration reduction. Project crashing scenarios were analysed using QM for Windows V5 and LINGO optimization software. Among several scenarios, the most efficient was shortening the project duration by one month at an additional cost of $8,725, offering the best time-cost trade-off. The engineering economic analysis was conducted in parallel, evaluating the project's financial performance over a 25-year lifecycle. Key metrics such as payback period and net present value (NPV) were calculated. The study also examined the financial benefits of project acceleration. This integrated approach—combining solar energy system design, CPM-based project scheduling, optimization software, and engineering economics—provides a comprehensive framework for sustainable energy implementation and efficient project management.

Zenodo (CERN European Organization for Nuclear Research)
Sakarya University (TR)
Openalex Percentile: Top 37%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.