Multiagent System Design of Aluminium Production Process and Generative AI Based Manpower Planning

Generative AI and autonomous software agents have increasingly become integral parts of both our social and professional lives. Their growing adoption offers significant advantages in areas such as process optimization and operational efficiency. This study explores the implementation of software agent technology within the context of workforce planning in an aluminium production facility. The goal is to demonstrate how multi-agent systems (MAS) can be applied to enhance decision-making and streamline manpower allocation. The methodology begins with the use of fuzzy logic, which enables decision-making based on expert knowledge and allows integration with conventional control techniques. While not intended to replace traditional methods, fuzzy logic simplifies the implementation of control systems, particularly in complex or uncertain environments. In the preliminary stage of the study, fuzzy logic was utilized to determine the most suitable department for MAS application. The analysis identified the method planning department as an optimal setting. Subsequently, a software agent was developed using Generative AI techniques and applied to a real production line within that department. The agent was designed to perform workforce planning tasks traditionally carried out by experienced staff. Comparative analysis between human decision-making and the agent-based system revealed that the AI-driven solution achieved a high degree of accuracy and operational speed, suggesting a viable alternative for repetitive and rule-based planning processes. This paper presents a novel application of Generative AI in industrial workforce management and contributes to the limited academic literature in this domain. By bridging the gap between academic research and practical industrial needs, the study offers a forward-looking perspective on how AI agents can effectively support complex production planning and resource allocation.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-11-05
DOI
https://doi.org/10.5281/zenodo.17530163
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multiagent System Design of Aluminium Production Process and Generative AI Based Manpower Planning

Zenodo (CERN European Organization for Nuclear Research)
Scheduling and Optimization Algorithms
article

Multiagent System Design of Aluminium Production Process and Generative AI Based Manpower Planning

article en

Abstract

Generative AI and autonomous software agents have increasingly become integral parts of both our social and professional lives. Their growing adoption offers significant advantages in areas such as process optimization and operational efficiency. This study explores the implementation of software agent technology within the context of workforce planning in an aluminium production facility. The goal is to demonstrate how multi-agent systems (MAS) can be applied to enhance decision-making and streamline manpower allocation. The methodology begins with the use of fuzzy logic, which enables decision-making based on expert knowledge and allows integration with conventional control techniques. While not intended to replace traditional methods, fuzzy logic simplifies the implementation of control systems, particularly in complex or uncertain environments. In the preliminary stage of the study, fuzzy logic was utilized to determine the most suitable department for MAS application. The analysis identified the method planning department as an optimal setting. Subsequently, a software agent was developed using Generative AI techniques and applied to a real production line within that department. The agent was designed to perform workforce planning tasks traditionally carried out by experienced staff. Comparative analysis between human decision-making and the agent-based system revealed that the AI-driven solution achieved a high degree of accuracy and operational speed, suggesting a viable alternative for repetitive and rule-based planning processes. This paper presents a novel application of Generative AI in industrial workforce management and contributes to the limited academic literature in this domain. By bridging the gap between academic research and practical industrial needs, the study offers a forward-looking perspective on how AI agents can effectively support complex production planning and resource allocation.

Zenodo (CERN European Organization for Nuclear Research)
Bahçeşehir University (TR), İstanbul Gelişim Üniversitesi (TR)
Openalex Percentile: Top 39%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multiagent System Design of Aluminium Production Process and Generative AI Based Manpower Planning · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS