Integrated risk response decision-making frameworks for EPC+PPP projects: a consideration of the dual status of the private sector

Purpose EPC+PPP projects are gaining prominence across diverse industries; however, challenges arise from intricate stakeholder relationships and the dual role of the private sector as Party A and Party B, potentially compromising project success. The research’s objective is to mitigate project risks by elucidating intricate stakeholder interactions and the private sector’s dual influence, thereby enhancing decision-making processes in complex EPC+PPP environments. Design/methodology/approach An integrated approach is proposed. First, it proposes an evaluation system for assessing the implementation difficulty of projects under EPC+PPP. This system incorporates a balance coefficient for public-economic interests, reflecting the impact of the dual status of the private sector, which is determined using the stratified full consistency method (SFUCOM) and triangular fuzzy numbers (TFNs). Second, a two-layer network is established to depict stakeholder relationships and associated risks, thus providing a comprehensive view of the risk landscape. Subsequently, risk prioritization is executed using DSM to identify critical risk areas. Finally, an optimization model is developed to maximize the decision-maker’s utility to facilitate effective risk response decisions. Findings The findings underscore the system’s effectiveness in assessing project implementation difficulties and prioritizing risks, demonstrating the pivotal role of economic interests in shaping risk response strategies. Originality/value The study’s originality is evident in its integrated approach to risk assessment and decision optimization in EPC+PPP projects, providing a novel framework that bridges the gap between theoretical models and practical project management.

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-11-05
DOI
https://doi.org/10.1108/ecam-06-2024-0742
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated risk response decision-making frameworks for EPC+PPP projects: a consideration of the dual status of the private sector

Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Integrated risk response decision-making frameworks for EPC+PPP projects: a consideration of the dual status of the private sector

article en

Abstract

Purpose EPC+PPP projects are gaining prominence across diverse industries; however, challenges arise from intricate stakeholder relationships and the dual role of the private sector as Party A and Party B, potentially compromising project success. The research’s objective is to mitigate project risks by elucidating intricate stakeholder interactions and the private sector’s dual influence, thereby enhancing decision-making processes in complex EPC+PPP environments. Design/methodology/approach An integrated approach is proposed. First, it proposes an evaluation system for assessing the implementation difficulty of projects under EPC+PPP. This system incorporates a balance coefficient for public-economic interests, reflecting the impact of the dual status of the private sector, which is determined using the stratified full consistency method (SFUCOM) and triangular fuzzy numbers (TFNs). Second, a two-layer network is established to depict stakeholder relationships and associated risks, thus providing a comprehensive view of the risk landscape. Subsequently, risk prioritization is executed using DSM to identify critical risk areas. Finally, an optimization model is developed to maximize the decision-maker’s utility to facilitate effective risk response decisions. Findings The findings underscore the system’s effectiveness in assessing project implementation difficulties and prioritizing risks, demonstrating the pivotal role of economic interests in shaping risk response strategies. Originality/value The study’s originality is evident in its integrated approach to risk assessment and decision optimization in EPC+PPP projects, providing a novel framework that bridges the gap between theoretical models and practical project management.

Engineering Construction & Architectural Management
Technology Holding (United States) (US), Yan'an University (CN), China Railway Fifth Survey and Design Institute Group (CN), ATK Holding Group (China) (CN), China Railway Construction Corporation (China) (CN), China Railway Group (China) (CN), China Power Engineering Consulting Group (China) (CN)
Peace, Justice and strong institutions
Openalex Percentile: Top 37%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.