Feasibility Study of Investment in New Conveyor Facility for CHF Supply Power Plant ABC PT XYZ

PLTU ABC is a coal-fired steam power plant that receives its coal supply from PT XYZ. At present, coal delivery relies on a single conveyor system with a capacity of 1,200 tons per hour. Since PT XYZ supplies coal based on the power plant’s demand, the conveyor must remain operational 24 hours a day. Any unplanned maintenance on the conveyor can disrupt supply and result in lost electricity production. Monthly coal delivery targets have been established, necessitating alternative delivery methods in case the conveyor system fails. Three alternative solutions have been identified: leasing a temporary conveyor, investing in a new conveyor system, or switching to direct coal delivery via trucks. The capital expenditure estimates are based on historical purchase data, adjusted for inflation over the past five years. The financial analysis indicates that direct truck delivery offers the highest return on investment and stronger cash flow compared to either leasing or constructing a new conveyor system. The project’s financial metrics include a Net Present Value (NPV) of IDR 51.22 billion, an Internal Rate of Return (IRR) of 60.13%, a Modified Internal Rate of Return (MIRR) of 24.54%, and a payback period of 1.55 years. Further validation using sensitivity analysis, scenario analysis, and Monte Carlo simulations showed that the probability of achieving a positive NPV (NPV > 0) is 65%. Based on these findings, it is concluded that direct delivery by trucks is more financially viable than investing in or leasing conveyor facilities.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-10-01
DOI
https://doi.org/10.31538/iijse.v8i3.7289
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Feasibility Study of Investment in New Conveyor Facility for CHF Supply Power Plant ABC PT XYZ

SHILAP Revista de lepidopterología
Mining Techniques and Economics
article

Feasibility Study of Investment in New Conveyor Facility for CHF Supply Power Plant ABC PT XYZ

article en

Abstract

PLTU ABC is a coal-fired steam power plant that receives its coal supply from PT XYZ. At present, coal delivery relies on a single conveyor system with a capacity of 1,200 tons per hour. Since PT XYZ supplies coal based on the power plant’s demand, the conveyor must remain operational 24 hours a day. Any unplanned maintenance on the conveyor can disrupt supply and result in lost electricity production. Monthly coal delivery targets have been established, necessitating alternative delivery methods in case the conveyor system fails. Three alternative solutions have been identified: leasing a temporary conveyor, investing in a new conveyor system, or switching to direct coal delivery via trucks. The capital expenditure estimates are based on historical purchase data, adjusted for inflation over the past five years. The financial analysis indicates that direct truck delivery offers the highest return on investment and stronger cash flow compared to either leasing or constructing a new conveyor system. The project’s financial metrics include a Net Present Value (NPV) of IDR 51.22 billion, an Internal Rate of Return (IRR) of 60.13%, a Modified Internal Rate of Return (MIRR) of 24.54%, and a payback period of 1.55 years. Further validation using sensitivity analysis, scenario analysis, and Monte Carlo simulations showed that the probability of achieving a positive NPV (NPV > 0) is 65%. Based on these findings, it is concluded that direct delivery by trucks is more financially viable than investing in or leasing conveyor facilities.

SHILAP Revista de lepidopterología
Bandung Institute of Technology (ID)
Openalex Percentile: Top 43%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.