A techno-economic assessment of decommissioning an offshore wind farm in The Netherlands

Offshore wind energy is essential for the global energy transition, but many countries overlook the decommissioning phase, leading to final inflated budget and excessive bank guarantees. In this paper, the current regulatory framework for offshore wind farm decommissioning is evaluated and process optimisation to reduce costs while meeting international regulatory, environmental and safety standards is explored. By analysing market knowledge and assembling a project team, it was estimated that costs can be reduced by 20% through optimised processes and government agreements. Key cost drivers include foundation removal, requiring expensive jack-up vessels, and risks such as vessel availability and logistics delays. Early planning is recommended to mitigate these risks. While the study's findings show potential for cost savings, further decommissioning projects are needed to validate the assumptions and technical solutions. A budget estimation following a selected decommissioning strategy was made, which shows that initial budget estimations could be reduced by 20% when processes are optimised and agreements are made with the government.

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2025-10-20
DOI
https://doi.org/10.1680/jcien.25.00061
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A techno-economic assessment of decommissioning an offshore wind farm in The Netherlands

Proceedings of the Institution of Civil Engineers - Civil Engineering
Marine and Offshore Engineering Studies
article

A techno-economic assessment of decommissioning an offshore wind farm in The Netherlands

article en

Abstract

Offshore wind energy is essential for the global energy transition, but many countries overlook the decommissioning phase, leading to final inflated budget and excessive bank guarantees. In this paper, the current regulatory framework for offshore wind farm decommissioning is evaluated and process optimisation to reduce costs while meeting international regulatory, environmental and safety standards is explored. By analysing market knowledge and assembling a project team, it was estimated that costs can be reduced by 20% through optimised processes and government agreements. Key cost drivers include foundation removal, requiring expensive jack-up vessels, and risks such as vessel availability and logistics delays. Early planning is recommended to mitigate these risks. While the study's findings show potential for cost savings, further decommissioning projects are needed to validate the assumptions and technical solutions. A budget estimation following a selected decommissioning strategy was made, which shows that initial budget estimations could be reduced by 20% when processes are optimised and agreements are made with the government.

Proceedings of the Institution of Civil Engineers - Civil EngineeringVol. 179(1)
University of Peloponnese (GR), Open University of Cyprus (CY)
Affordable and clean energy
Openalex Percentile: Top 42%
Marine and Offshore Engineering Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.