Thames Tideway Tunnel: design responsibilities, phases and system-wide design challenges

The Thames Tideway Tunnel project is a deep tunnel system for combined sewer overflow (CSO) control in London, UK. The project comprises 20 shafts and 14 tunnels to actively manage flows from 34 CSOs by transferring flows to Beckton Sewage Treatment Works for treatment. Multiple parties have either influenced or been responsible for the design of this large ‘specified infrastructure project’. Most design responsibility sat with four NEC3 design and construct contractors, but Tideway retained responsibility for system-wide hydraulic, air and control aspects. New standards were developed for the design of tangential vortex drops and for vertical deaeration within large circular shafts. A new methodology was developed for the ventilation design that analysed how air moves in and out of the tunnel system, is controlled and treated. Qualitative design aspirations and stakeholder requirements for the integration of the infrastructure in the public realm were captured in design principles and an innovative approach to heritage interpretation was used. Although all the CSO interception sites feature similar components, each site was different, leading to innovative designs by the contractors.

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2025-10-20
DOI
https://doi.org/10.1680/jcien.25.00054
Citations
9
Primary Topic
Aquatic Ecosystems and Phytoplankton Dynamics
Type
article
Field-Weighted Citation Impact
7.74
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thames Tideway Tunnel: design responsibilities, phases and system-wide design challenges

9 citations
Proceedings of the Institution of Civil Engineers - Civil Engineering
Aquatic Ecosystems and Phytoplankton Dynamics
7.74
article

Thames Tideway Tunnel: design responsibilities, phases and system-wide design challenges

article en
9 citations

Abstract

The Thames Tideway Tunnel project is a deep tunnel system for combined sewer overflow (CSO) control in London, UK. The project comprises 20 shafts and 14 tunnels to actively manage flows from 34 CSOs by transferring flows to Beckton Sewage Treatment Works for treatment. Multiple parties have either influenced or been responsible for the design of this large ‘specified infrastructure project’. Most design responsibility sat with four NEC3 design and construct contractors, but Tideway retained responsibility for system-wide hydraulic, air and control aspects. New standards were developed for the design of tangential vortex drops and for vertical deaeration within large circular shafts. A new methodology was developed for the ventilation design that analysed how air moves in and out of the tunnel system, is controlled and treated. Qualitative design aspirations and stakeholder requirements for the integration of the infrastructure in the public realm were captured in design principles and an innovative approach to heritage interpretation was used. Although all the CSO interception sites feature similar components, each site was different, leading to innovative designs by the contractors.

Proceedings of the Institution of Civil Engineers - Civil EngineeringVol. 178(6)
Mott MacDonald (United Kingdom) (GB), Jacobs (United Kingdom) (GB), Jacobs (United States) (US)
Clean water and sanitation
Openalex Percentile: Top 2%
Aquatic Ecosystems and Phytoplankton Dynamics
7.74
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.