Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining

The mining drawing schedule is related to the safety, environment and ground pressure control of mine production, and is of great significance for controlling the economic indicators of mine operation in block cave mining. The mixed integer programming (MIP) method has been proved to be very effective in solving the medium- to long-term drawing sequence optimization problem in mines. The amount of ore, three kinds of the draw points priority order with diamond undercutting mode, and the logical relationship are considered as constraints based on the value model of ore–rock mixing. The maximizing net present value of the mining operation is used as objective function. Application and analysis of the model is solved using CPLEX, MATLAB, and YALMIP for a specific Chinese copper mine using 770 drawpoints over 7-year (28-quarter) periods.

Institutions

Publication Details

Journal
Journal of Mining Science
Published
2025-06-01
DOI
https://doi.org/10.1134/s106273912503010x
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining

Journal of Mining Science
Mining Techniques and Economics
article

Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining

article en

Abstract

The mining drawing schedule is related to the safety, environment and ground pressure control of mine production, and is of great significance for controlling the economic indicators of mine operation in block cave mining. The mixed integer programming (MIP) method has been proved to be very effective in solving the medium- to long-term drawing sequence optimization problem in mines. The amount of ore, three kinds of the draw points priority order with diamond undercutting mode, and the logical relationship are considered as constraints based on the value model of ore–rock mixing. The maximizing net present value of the mining operation is used as objective function. Application and analysis of the model is solved using CPLEX, MATLAB, and YALMIP for a specific Chinese copper mine using 770 drawpoints over 7-year (28-quarter) periods.

Journal of Mining ScienceVol. 61(3)
Central South University (CN), State Administration of Work Safety (CN), Henan Polytechnic University (CN)
Openalex Percentile: Top 43%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.