D5.11 – RESTORE Replication Strategy (V2)
Deliverable 5.11 provides information about the RESTORE project’s EU-wide replication strategy from task T5.5 on “Replication Strategy via Stakeholders additional Cases”, led by SIMTECH and PI. Results of task T5.5 were initially reported in the D5.10 in month M26, and also in the current deliverable D5.11 (V2), in M48. Deliverable D5.11 was produced by SIMTECH, and reports the result of the complete work carried out in T5.5 during the period of M9 to M48 of the project, from the description of the specified replication strategy to motivate RESTORE’s stakeholders to create additional cases and trials during and after the project lifetime, using the RESTORE Virtual Tool powered by the IPSE GO simulation web-platform. The creation of stakeholders’ additional test-cases were encouraged to be based on the six RESTORE virtual use-cases, developed in WP5 task T5.4 (Implementation, Optimization, Management & Validation of RESTORE Use-Cases using the Simulation Web Platform). The information provided in this document builds upon collaboration between SIMTECH and PROSPEX Institute (PI), with contributions from other RESTORE partners, considering inputs from WP1, WP6, and WP7 among others.
Institutions
- Simulation Technologies (United States) (US)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-09-30
- DOI
- https://doi.org/10.5281/zenodo.17398427
- Primary Topic
- Simulation Techniques and Applications
- Type
- article
- Field-Weighted Citation Impact
- 0.00