Application of hierarchical optimization of gates and units, and flow-classification water level control rules, and model predictive control in reservoir real-time optimal scheduling

Study region: This study used the Xiajiang Reservoir (China) as a case study. Study focus: This study focuses on the following issues in reservoir scheduling: low efficiency of gate-unit optimisation, difficulty in controlling end-period water levels, and difficulty in achieving real-time scheduling with uncertain incoming water. This study constructs a hierarchical real-time optimisation scheduling (ROS) model, proposes an end-period water level control strategy integrating flow-classification water-level control rules (FWCR), and introduces model predictive control (MPC) to address the uncertainty of inflow. The main contributions of this study are as follows: (1) Hierarchical optimisation strategy (HOS) decomposes high-dimensional optimisation into upper-level unit-virtual aggregated gate joint optimisation and lower-level multi-gate discharge optimisation; (2) FWCR ensures end-period water level safety; (3) Constructed an MPC framework with ROS module to achieve real-time scheduling under water uncertainty. New hydrological insights for the region: (1) The hierarchical optimisation scheduling model (HOSM) outperformed the traditional optimisation scheduling model (OSM), with the 20-year flood peak shaving rate increasing from 7.09 % to 9.62 %; (2) With FWCR, HOSM further raised peak shaving to 9.88 %, reduced gate operations (29−22), increased power generation by 22.6 %, and lowered end-period water level by 1.02 m; (3) Optimal MPC parameters (36–48 h prediction horizon, 2–3 h decision step size) achieved 10.81 % peak shaving; feedback correction module max water level by 0.08–0.15 m. The HOS-MPC system based on FWCR provides a reference for real-time scheduling under uncertain inflow conditions.

Publication Details

Journal
Journal of Hydrology Regional Studies
Published
2025-10-15
DOI
https://doi.org/10.1016/j.ejrh.2025.102845
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of hierarchical optimization of gates and units, and flow-classification water level control rules, and model predictive control in reservoir real-time optimal scheduling

Journal of Hydrology Regional Studies
Water resources management and optimization
article

Application of hierarchical optimization of gates and units, and flow-classification water level control rules, and model predictive control in reservoir real-time optimal scheduling

article en

Abstract

Study region: This study used the Xiajiang Reservoir (China) as a case study. Study focus: This study focuses on the following issues in reservoir scheduling: low efficiency of gate-unit optimisation, difficulty in controlling end-period water levels, and difficulty in achieving real-time scheduling with uncertain incoming water. This study constructs a hierarchical real-time optimisation scheduling (ROS) model, proposes an end-period water level control strategy integrating flow-classification water-level control rules (FWCR), and introduces model predictive control (MPC) to address the uncertainty of inflow. The main contributions of this study are as follows: (1) Hierarchical optimisation strategy (HOS) decomposes high-dimensional optimisation into upper-level unit-virtual aggregated gate joint optimisation and lower-level multi-gate discharge optimisation; (2) FWCR ensures end-period water level safety; (3) Constructed an MPC framework with ROS module to achieve real-time scheduling under water uncertainty. New hydrological insights for the region: (1) The hierarchical optimisation scheduling model (HOSM) outperformed the traditional optimisation scheduling model (OSM), with the 20-year flood peak shaving rate increasing from 7.09 % to 9.62 %; (2) With FWCR, HOSM further raised peak shaving to 9.88 %, reduced gate operations (29−22), increased power generation by 22.6 %, and lowered end-period water level by 1.02 m; (3) Optimal MPC parameters (36–48 h prediction horizon, 2–3 h decision step size) achieved 10.81 % peak shaving; feedback correction module max water level by 0.08–0.15 m. The HOS-MPC system based on FWCR provides a reference for real-time scheduling under uncertain inflow conditions.

Journal of Hydrology Regional StudiesVol. 62
Clean water and sanitation
Openalex Percentile: Top 43%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Application of hierarchical optimization of gates and units, and flow-classification water level control rules, and model predictive control in reservoir real-time optimal scheduling · Journal of Hydrology Regional Studies (2025) | TGRS Research Map | TGRS