Influence of Branch Pipe Arrangement on Hydraulic Transition Process in Water Conveyance Systems

[Objective] Appropriately reducing the diameter of branch pipes is an effective way to lower the superimposed water hammer pressure in water conveyance systems. However, there is limited research on how replacing a single large-diameter branch pipe with multiple smaller parallel branch pipes affects the hydraulic transient process in such systems. Moreover, there is a lack of research on how to design the diameters of these parallel branches to minimize hydraulic transients while maintaining flow requirements and ensuring economic efficiency. Based on the Qitai high-head gravity-flow water conveyance project, we investigated the impact of branch pipe arrangement on hydraulic transients and proposes principles for determining branch pipe diameters. [Methods] Using numerical simulation, we compared the hydraulic transient behavior in complex pipelines with a single branch pipe versus multiple small-diameter parallel branches, and examined the impact of parallel arrangements on water hammer pressure and pressure fluctuation duration, summarized the design method for branch pipe diameters in parallel schemes, and verified the engineering applicability of the conclusions using a real-world case. [Results] When the number of parallel branch pipes increased from 2 to 5, the maximum positive pressure head in both main and branch pipes significantly decreased under various scenarios. Under the most critical condition, the maximum water hammer pressure was reduced by 10.32% in the main pipe and 48.75% in the branch pipes, respectively, compared to the single large-diameter branch layout. Simultaneous valve closures in the branches did not result in additional pressure increases in the main pipe, and water hammer waves between branches did not interfere with one another. Moreover, replacing a single large branch with multiple smaller branches effectively eliminated negative pressure heads in the branches, thus preventing negative-pressure-induced water hammer, and shortened the duration of pressure fluctuations. The maximum reductions in pressure fluctuation duration at key points in the main and branch pipes were 63.16% and 46.15%, respectively. For stable hydraulic transitions and economic feasibility, the ratio of branch to main pipe diameter at the connection point should be between 0.12<β<0.28. In the Qitai project, using two parallel branch pipes (β=0.226) increased construction costs by 33.33% compared to the single large branch solution, but reduced investment in water hammer protection by 39.10%. [Conclusions] Under the premise of safe water delivery, a water supply scheme that replaces a single large-diameter branch pipe with multiple smaller parallel branches can effectively reduce valve-closing water hammer pressure and shorten the duration of pipeline pressure fluctuations.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-10-01
DOI
https://doi.org/10.11988/ckyyb.20240768
Primary Topic
Water Systems and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Influence of Branch Pipe Arrangement on Hydraulic Transition Process in Water Conveyance Systems

SHILAP Revista de lepidopterología
Water Systems and Optimization
article

Influence of Branch Pipe Arrangement on Hydraulic Transition Process in Water Conveyance Systems

article en

Abstract

[Objective] Appropriately reducing the diameter of branch pipes is an effective way to lower the superimposed water hammer pressure in water conveyance systems. However, there is limited research on how replacing a single large-diameter branch pipe with multiple smaller parallel branch pipes affects the hydraulic transient process in such systems. Moreover, there is a lack of research on how to design the diameters of these parallel branches to minimize hydraulic transients while maintaining flow requirements and ensuring economic efficiency. Based on the Qitai high-head gravity-flow water conveyance project, we investigated the impact of branch pipe arrangement on hydraulic transients and proposes principles for determining branch pipe diameters. [Methods] Using numerical simulation, we compared the hydraulic transient behavior in complex pipelines with a single branch pipe versus multiple small-diameter parallel branches, and examined the impact of parallel arrangements on water hammer pressure and pressure fluctuation duration, summarized the design method for branch pipe diameters in parallel schemes, and verified the engineering applicability of the conclusions using a real-world case. [Results] When the number of parallel branch pipes increased from 2 to 5, the maximum positive pressure head in both main and branch pipes significantly decreased under various scenarios. Under the most critical condition, the maximum water hammer pressure was reduced by 10.32% in the main pipe and 48.75% in the branch pipes, respectively, compared to the single large-diameter branch layout. Simultaneous valve closures in the branches did not result in additional pressure increases in the main pipe, and water hammer waves between branches did not interfere with one another. Moreover, replacing a single large branch with multiple smaller branches effectively eliminated negative pressure heads in the branches, thus preventing negative-pressure-induced water hammer, and shortened the duration of pressure fluctuations. The maximum reductions in pressure fluctuation duration at key points in the main and branch pipes were 63.16% and 46.15%, respectively. For stable hydraulic transitions and economic feasibility, the ratio of branch to main pipe diameter at the connection point should be between 0.12<β<0.28. In the Qitai project, using two parallel branch pipes (β=0.226) increased construction costs by 33.33% compared to the single large branch solution, but reduced investment in water hammer protection by 39.10%. [Conclusions] Under the premise of safe water delivery, a water supply scheme that replaces a single large-diameter branch pipe with multiple smaller parallel branches can effectively reduce valve-closing water hammer pressure and shorten the duration of pipeline pressure fluctuations.

SHILAP Revista de lepidopterología
Xinjiang Institute of Water Resources and Hydropower Research (CN)
Openalex Percentile: Top 49%
Water Systems and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.