Application of ASME BPVC section VIII, division-2, design by analysis requirement to FRIB static beam dump
The Facility for Rare Isotope Beams (FRIB) at Michigan State University is a high-power heavy-ion accelerator, completed in 2022. Its driver linac is designed to accelerate all stable ions to energies exceeding 200 MeV/u, with a maximum beam power of 400 kW. Currently, FRIB operates at beam powers between 10 and 20 kW, delivering multiple primary beam species. Approximately 75% of the primary beam power is absorbed by the beam dump. The existing mini-channel beam dump (MCBD) absorber is designed to handle up to 20 kW, with plans for an optimized beam dump capable of supporting 30 kW and beyond. This paper presents the design-by-analysis procedures outlined in ASME Boiler and Pressure Vessel Code that have been applied to the MCBD design.
Publication Details
- Journal
- JACOW
- Published
- 2025-10-14
- DOI
- https://doi.org/10.18429/jacow-hiat2025-tup05
- Primary Topic
- Particle accelerators and beam dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00