IMPLEMENTATION OF BIM 5D IN THE IMPLEMENTATION PLAN OF THE TRANS SUMATRA – JAMBI TOLL ROAD WITH CIVIL 3D AND NAVISWORK

Significant contributions to technological advancement are helpful in various aspects of work. In Circular Letter 11/SE/Db/2021, it is emphasized that the use of Building Information Modelling (BIM) must be applied in the planning stage of highway construction. 3D and 5D modeling can be done using Autodesk Civil 3D, while 4D modeling can be facilitated through Autodesk Navisworks. This study takes the Trans Sumatra Jambi Toll Road Project as an object of study with the aim of modeling toll roads using BIM-based Autodesk Civil 3D, analyzing the estimated costs from the modeling results, and visualizing the progress plan of mainroad work at a certain time through Autodesk Navisworks. Secondary data includes DED, BoQ and HSP. Modeling was performed on Autodesk Civil 3D including modeling of excavations and embankments as well as road pavement and drainage structures, Clash detection using Autodesk Naviswork, volume of work integrated using Microsoft Project and time simulation using Autodesk Naviswork. The results of the study show that from the modeling that has been carried out, the estimated cost of mainroad work has a deviation of -3.24% from the BoQ document. Comparison of data shows that the estimated volume and cost generated using the Autodesk Civil 3D BIM method is smaller than the conventional method. Simulated mainroad work progress display using Autodesk Naviswork software shows construction simulations, time progress tracking, and cost estimation in an integrated and informative manner to support project decision-making.

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2025-09-30
DOI
https://doi.org/10.24843/jits.2025.v29.i02.p09
Primary Topic
Corporate Governance and Financial Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IMPLEMENTATION OF BIM 5D IN THE IMPLEMENTATION PLAN OF THE TRANS SUMATRA – JAMBI TOLL ROAD WITH CIVIL 3D AND NAVISWORK

Jurnal Ilmiah Teknik Sipil
Corporate Governance and Financial Management
article

IMPLEMENTATION OF BIM 5D IN THE IMPLEMENTATION PLAN OF THE TRANS SUMATRA – JAMBI TOLL ROAD WITH CIVIL 3D AND NAVISWORK

article en

Abstract

Significant contributions to technological advancement are helpful in various aspects of work. In Circular Letter 11/SE/Db/2021, it is emphasized that the use of Building Information Modelling (BIM) must be applied in the planning stage of highway construction. 3D and 5D modeling can be done using Autodesk Civil 3D, while 4D modeling can be facilitated through Autodesk Navisworks. This study takes the Trans Sumatra Jambi Toll Road Project as an object of study with the aim of modeling toll roads using BIM-based Autodesk Civil 3D, analyzing the estimated costs from the modeling results, and visualizing the progress plan of mainroad work at a certain time through Autodesk Navisworks. Secondary data includes DED, BoQ and HSP. Modeling was performed on Autodesk Civil 3D including modeling of excavations and embankments as well as road pavement and drainage structures, Clash detection using Autodesk Naviswork, volume of work integrated using Microsoft Project and time simulation using Autodesk Naviswork. The results of the study show that from the modeling that has been carried out, the estimated cost of mainroad work has a deviation of -3.24% from the BoQ document. Comparison of data shows that the estimated volume and cost generated using the Autodesk Civil 3D BIM method is smaller than the conventional method. Simulated mainroad work progress display using Autodesk Naviswork software shows construction simulations, time progress tracking, and cost estimation in an integrated and informative manner to support project decision-making.

Jurnal Ilmiah Teknik SipilVol. 29(2)
Udayana University (ID)
Sustainable cities and communities
Openalex Percentile: Top 35%
Corporate Governance and Financial Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

IMPLEMENTATION OF BIM 5D IN THE IMPLEMENTATION PLAN OF THE TRANS SUMATRA – JAMBI TOLL ROAD WITH CIVIL 3D AND NAVISWORK · Jurnal Ilmiah Teknik Sipil (2025) | TGRS Research Map | TGRS