Testing for Certification of CVMTM Sensors on the 737NG Aft Pressure Bulkhead

Boeing has invested in the development of health monitoring sensors over the years and is currently working multiple projects to implement such technology as viable inspection methods. In 2016, Boeing added Comparative Vacuum Monitoring (CVMTM) sensors as an alternative inspection method on the 737NG Center Wing Box fittings utilizing an economic service bulletin. In 2018, Boeing partnered with Anodyne Electronics Manufacturing (AEM) Corp and Delta TechOps to pursue using CVM sensors on the web of the 737NG Aft Pressure Bulkhead as an alternative inspection to Service Bulletin (SB) 737-53A1248. This is a safety bulletin due to reported in-service cracks on the 737 classic models and is mandated by the FAA with an Advisory Directive (AD). In 2022, Boeing launched the certification project. This paper will cover some of the testing that went into the certification of CVM sensors for this targeted application. Boeing has received FAA approval for their method of compliance issue paper and certification plan. Boeing has completed all tests and demonstrated that the CVM sensors are as effective as low frequency eddy current (LFEC) inspections for this application. Service Bulletin (SB) 737-53-1418 is being developed to allow operators to use CVM for this application. Boeing is currently finalizing the certification documents for submission to the FAA. CVM sensors were installed at the critical location - the web to “Y” chord attachment between stringers 5 to 7 on the left side and stringers 5 to 9 on the right side. The proposed CVM option will demonstrate equivalency to LFEC and utilize the same inspection interval. The CVM system is expected to reduce the inspection time from 24 hours to 15 minutes by eliminating the access removals (aft galley, insulation blankets) or tailcone entry, needed to allow inspector admission to conduct the traditional nondestructive inspection.

Publication Details

Published
2025-09-09
DOI
https://doi.org/10.12783/shm2025/37287
Primary Topic
Plant biochemistry and biosynthesis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Testing for Certification of CVMTM Sensors on the 737NG Aft Pressure Bulkhead

Plant biochemistry and biosynthesis
article

Testing for Certification of CVMTM Sensors on the 737NG Aft Pressure Bulkhead

article en

Abstract

Boeing has invested in the development of health monitoring sensors over the years and is currently working multiple projects to implement such technology as viable inspection methods. In 2016, Boeing added Comparative Vacuum Monitoring (CVMTM) sensors as an alternative inspection method on the 737NG Center Wing Box fittings utilizing an economic service bulletin. In 2018, Boeing partnered with Anodyne Electronics Manufacturing (AEM) Corp and Delta TechOps to pursue using CVM sensors on the web of the 737NG Aft Pressure Bulkhead as an alternative inspection to Service Bulletin (SB) 737-53A1248. This is a safety bulletin due to reported in-service cracks on the 737 classic models and is mandated by the FAA with an Advisory Directive (AD). In 2022, Boeing launched the certification project. This paper will cover some of the testing that went into the certification of CVM sensors for this targeted application. Boeing has received FAA approval for their method of compliance issue paper and certification plan. Boeing has completed all tests and demonstrated that the CVM sensors are as effective as low frequency eddy current (LFEC) inspections for this application. Service Bulletin (SB) 737-53-1418 is being developed to allow operators to use CVM for this application. Boeing is currently finalizing the certification documents for submission to the FAA. CVM sensors were installed at the critical location - the web to “Y” chord attachment between stringers 5 to 7 on the left side and stringers 5 to 9 on the right side. The proposed CVM option will demonstrate equivalency to LFEC and utilize the same inspection interval. The CVM system is expected to reduce the inspection time from 24 hours to 15 minutes by eliminating the access removals (aft galley, insulation blankets) or tailcone entry, needed to allow inspector admission to conduct the traditional nondestructive inspection.

Openalex Percentile: Top 45%
Plant biochemistry and biosynthesis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.