The Application of Project Life Cycle Method to the Infrastructure Projects

Abstract: This paper is written to introduce the application of the project management life cycle to the infrastructure projects (metro construction project as a case study). Metro construction should technically and economically be optimized to achieve maximum efficiency. In this regard, the selection of a project management life cycle methodology is very important to achieve these project objectives. Underground constructions in urban regions, such as metro construction, have been largely used for extending daily human life into underground spaces. Therefore, the recognition of the complex elements of a metro construction can play a significant role in its project management and planning. This study aims to investigate these complexities in subway construction. This may develop the possibility of high predictability for these challenges. As metro projects are also urban underground projects, both internal and external issues are studied, and their impacts on project management are discussed. It is concluded that exceptional differences in the management and planning of these constructions is that combined internal and external complexities are carried out simultaneously. Keywords: Project life cycle, infrastructure, underground, metro. Title: The Application of Project Life Cycle Method to the Infrastructure Projects Author: Awad Eisa G. Mohamed, Maaz Osman Bashir International Journal of Interdisciplinary Research and Innovations ISSN 2348-1218 (print), ISSN 2348-1226 (online) Vol. 13, Issue 4, October 2025 - December 2025 Page No: 6-11 Research Publish Journals Website: www.researchpublish.com Published Date: 09-October-2025 DOI: https://doi.org/10.5281/zenodo.17303957 Paper Download Link (Source) https://www.researchpublish.com/papers/the-application-of-project-life-cycle-method-to-the-infrastructure-projects

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-10-09
DOI
https://doi.org/10.5281/zenodo.17303956
Primary Topic
Asthma and respiratory diseases
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Application of Project Life Cycle Method to the Infrastructure Projects

Zenodo (CERN European Organization for Nuclear Research)
Asthma and respiratory diseases
article

The Application of Project Life Cycle Method to the Infrastructure Projects

article en

Abstract

Abstract: This paper is written to introduce the application of the project management life cycle to the infrastructure projects (metro construction project as a case study). Metro construction should technically and economically be optimized to achieve maximum efficiency. In this regard, the selection of a project management life cycle methodology is very important to achieve these project objectives. Underground constructions in urban regions, such as metro construction, have been largely used for extending daily human life into underground spaces. Therefore, the recognition of the complex elements of a metro construction can play a significant role in its project management and planning. This study aims to investigate these complexities in subway construction. This may develop the possibility of high predictability for these challenges. As metro projects are also urban underground projects, both internal and external issues are studied, and their impacts on project management are discussed. It is concluded that exceptional differences in the management and planning of these constructions is that combined internal and external complexities are carried out simultaneously. Keywords: Project life cycle, infrastructure, underground, metro. Title: The Application of Project Life Cycle Method to the Infrastructure Projects Author: Awad Eisa G. Mohamed, Maaz Osman Bashir International Journal of Interdisciplinary Research and Innovations ISSN 2348-1218 (print), ISSN 2348-1226 (online) Vol. 13, Issue 4, October 2025 - December 2025 Page No: 6-11 Research Publish Journals Website: www.researchpublish.com Published Date: 09-October-2025 DOI: https://doi.org/10.5281/zenodo.17303957 Paper Download Link (Source) https://www.researchpublish.com/papers/the-application-of-project-life-cycle-method-to-the-infrastructure-projects

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 41%
Asthma and respiratory diseases
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Application of Project Life Cycle Method to the Infrastructure Projects · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS