Perhitungan Biaya Produksi Alat Muat dan Angkut di Pit Mudak PT Teknik Alum Service

PT Teknik Alum Service is a company that mines nickel ore located in Buleleng.Village, Bungku Pesisir District, Morowali Regency, Central Sulawesi Province. The costs of loading and transporting nickel from the mine to the jetty using loading and transportation equipment are carried out to determine the components of production operating costs. Production costs are costs incurred during the production process. To produce large tool productivity for the company, of course, it is necessary to calculate the production costs of using the tool based on the production target plan that has been determined by the company. From this identification, the objectives of this research are asFollows: a. find out how much loading and conveyance equipment is produced at the Mudak Pit, b. Find out how much the production costs of loading equipment and conveyance are profitable for the company. PT Teknik Alum Service Teknik Alum Service has a monthly production target of 50,000 tons/month.

Institutions

Publication Details

Journal
Journal of Engineering Science and Technology Applications
Published
2025-04-18
DOI
https://doi.org/10.58227/jesta.v3i1.212
Primary Topic
Global Trade and Competitiveness
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perhitungan Biaya Produksi Alat Muat dan Angkut di Pit Mudak PT Teknik Alum Service

Journal of Engineering Science and Technology Applications
Global Trade and Competitiveness
article

Perhitungan Biaya Produksi Alat Muat dan Angkut di Pit Mudak PT Teknik Alum Service

article en

Abstract

PT Teknik Alum Service is a company that mines nickel ore located in Buleleng.Village, Bungku Pesisir District, Morowali Regency, Central Sulawesi Province. The costs of loading and transporting nickel from the mine to the jetty using loading and transportation equipment are carried out to determine the components of production operating costs. Production costs are costs incurred during the production process. To produce large tool productivity for the company, of course, it is necessary to calculate the production costs of using the tool based on the production target plan that has been determined by the company. From this identification, the objectives of this research are asFollows: a. find out how much loading and conveyance equipment is produced at the Mudak Pit, b. Find out how much the production costs of loading equipment and conveyance are profitable for the company. PT Teknik Alum Service Teknik Alum Service has a monthly production target of 50,000 tons/month.

Journal of Engineering Science and Technology ApplicationsVol. 3(1)
Cenderawasih University (ID), Khairun University (ID), Universitas Sulawesi Tenggara (ID), Universitas Subang (ID)
Openalex Percentile: Top 35%
Global Trade and Competitiveness
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Perhitungan Biaya Produksi Alat Muat dan Angkut di Pit Mudak PT Teknik Alum Service · Journal of Engineering Science and Technology Applications (2025) | TGRS Research Map | TGRS