Analisis Kelayakan Teknis dan Ekonomi Pembangunan Proyek Perumahan Nindya Asri 9

Housing is a group of houses that serve as residences and are equipped with adequate facilities and infrastructure. Nindya Asri 9 Housing is a housing complex built in Sasak, Meteseh, Kendal Regency, Central Java, by PT. Nindya Karya Utama. This housing complex is planned to have 270 units with types 29-60. This study aims to analyze the technical and economic feasibility of Nindya Asri 9 Housing Complex, reviewed from a comparison of benefit costs, net present value, and other methods. The research method used in this study is descriptive and quantitative. The research data consists of primary and secondary data. The technical feasibility data processing includes the Basic Building Efficiency (KDB), Building Floor Coefficient (KLB), Basic Green Coefficient (KDB), and Green Open Space (RTH). The economic feasibility data processing includes Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR), Payback Period (PP), and Profitability Index (PI). The analysis results of the interest rate of 10% with an investment period of 10 years. The technical feasibility of KDB is 50.2%, KLB is 0.6, KDH is 79%, and RTH is 58.4%. For economic feasibility, NPV is Rp. 5,506,655,627, BCR is 1.12113647, IRR is 17,09%, PP is 3.75 years, and PI is 1.376. This housing is feasible to use.

Institutions

Publication Details

Journal
Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan Informatika
Published
2025-09-18
DOI
https://doi.org/10.61132/jupiter.v3i5.1081
Primary Topic
Glioma Diagnosis and Treatment
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Kelayakan Teknis dan Ekonomi Pembangunan Proyek Perumahan Nindya Asri 9

Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan Informatika
Glioma Diagnosis and Treatment
article

Analisis Kelayakan Teknis dan Ekonomi Pembangunan Proyek Perumahan Nindya Asri 9

article en

Abstract

Housing is a group of houses that serve as residences and are equipped with adequate facilities and infrastructure. Nindya Asri 9 Housing is a housing complex built in Sasak, Meteseh, Kendal Regency, Central Java, by PT. Nindya Karya Utama. This housing complex is planned to have 270 units with types 29-60. This study aims to analyze the technical and economic feasibility of Nindya Asri 9 Housing Complex, reviewed from a comparison of benefit costs, net present value, and other methods. The research method used in this study is descriptive and quantitative. The research data consists of primary and secondary data. The technical feasibility data processing includes the Basic Building Efficiency (KDB), Building Floor Coefficient (KLB), Basic Green Coefficient (KDB), and Green Open Space (RTH). The economic feasibility data processing includes Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR), Payback Period (PP), and Profitability Index (PI). The analysis results of the interest rate of 10% with an investment period of 10 years. The technical feasibility of KDB is 50.2%, KLB is 0.6, KDH is 79%, and RTH is 58.4%. For economic feasibility, NPV is Rp. 5,506,655,627, BCR is 1.12113647, IRR is 17,09%, PP is 3.75 years, and PI is 1.376. This housing is feasible to use.

Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan InformatikaVol. 3(5)
Sultan Agung Islamic University (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 32%
Glioma Diagnosis and Treatment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Kelayakan Teknis dan Ekonomi Pembangunan Proyek Perumahan Nindya Asri 9 · Jupiter Publikasi Ilmu Keteknikan Industri Teknik Elektro dan Informatika (2025) | TGRS Research Map | TGRS